My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-01-14
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-01-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2013 8:49:52 AM
Creation date
1/10/2013 4:10:40 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
1/14/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
662
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.4.A. - Page 8 <br /> completion for new streets and the date each street was last reconstructed or <br /> renovated, based on the date the street was opened or reopened for traffic. <br /> HIGHWAY: Has the same meaning as right-of-way as defined below. <br /> PUBLIC PLACE: Has the same meaning as city property as defined herein. <br /> PUBLIC WAY: Has the same meaning as right-of-way as defined below. <br /> RECONSTRUCTION: Completely rebuilding a street by removing all the <br /> pavement and aggregate base course material, re-compacting the sub-base and <br /> restoring the base material and then completely re-paving the street. <br /> RENOVATION: A major rehabilitation including overlay or similar roadway <br /> improvement work that physically modifies the surface of the roadway prior to <br /> applying a new roadway surface or other similar work as determined by the City <br /> Engineer. <br /> REPAIR: Includes the construction, reconstruction, replacement, restoration, <br /> overlay or improvement of any walkway, driveway, street or right-of-way. <br /> RIGHT-OF-WAY: The surface of and the space above and below any street, <br /> road, highway, right-of-way, alley, easement, public utility easement, <br /> pathway, sidewalk and other public way, including driveway, curb, gutter, <br /> paving or other surface and subsurface drainage structure or facility and any <br /> public place, or City property, now or hereafter existing as such within the <br /> City. <br /> STREET: Has the same meaning as right-of-way. <br /> WALKWAY: Includes but is not limited to, a park or parking strip maintained in <br /> the area between the property line and the curb line and also includes a <br /> driveway, curbing, bulkhead, retaining wall, sidewalk or other works for the <br /> protection of any sidewalk or walkway or any such park or parking strip located in <br /> any street within the City. <br /> Sec. 29.3. Encroachment Permit Required. <br /> A. No person shall encroach nor place any encroachment upon, over or under <br /> the surface of any right-of-way or City property for any purpose whatsoever, <br /> without first obtaining a permit from the City in accordance with the provisions <br /> set forth herein. <br /> B. No person shall excavate, erect, construct, place or maintain any pipe, <br /> conduit, wire, cable or other structure, on, over or under the surface of any <br /> right-of-way or City property, for any purpose whatsoever, without first <br /> obtaining a permit from the City in accordance with the provisions set forth <br /> herein. <br /> ATTY/ORD.377/AMENDING CHAPTER 29 STREETS, SIDEWALKS AND DRIVEWAYS <br /> REV: 11-16-12 JS <br /> Page 5 of 28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.