My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-01-14
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-01-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2013 8:49:52 AM
Creation date
1/10/2013 4:10:40 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
1/14/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
662
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.B. - Page 45 <br /> Redwood City Chapter 3.Project Description <br /> Table 3-2. Summary of Construction Equipment <br /> Construction Phase/Task Type of Equipment Number <br /> Phase 1: Demolition/Site Preparation <br /> Temporary Fencing,Asphalt Removal Concrete/Industrial Saws 1 <br /> Rubber Tired Loaders 1 <br /> 10-ton Dump Trucks 10 <br /> Sub-grade Earthwork Rubber Tired Loaders 1 <br /> Tractors/Loaders/Backhoes 1 <br /> 10-ton Dump Trucks 7 <br /> Relocate Storm Drain Tractors/Loaders/Backhoes 1 <br /> Initial Concrete Work—Retaining Wall,Footings,Curb Tractors/Loaders/Backhoes 1 <br /> Concrete Trucks 1 <br /> Phase 2: Fuel System,Paving,Canopy <br /> Fuel System - - <br /> Paving: Prepare Base Rubber Tired Loaders 1 <br /> Base Delivery Trucks 13 <br /> Paving: Concrete Apron Concrete Trucks 5 <br /> Paving:Asphalt Surfaces Pavers 1 <br /> Rollers 1 <br /> Canopy and Installation Finishes Forklifts 2 <br /> Generator Sets 2 <br /> Landscaping/Striping Air Compressor 1 <br /> The site of the proposed modifications would be fenced during construction,with access limited to <br /> construction personnel and other authorized personnel only.All construction staging would occur <br /> on the project site.Nighttime lighting on the site during construction would be limited,providing <br /> only lighting necessary for safety and security.Consistent with the City's Noise Ordinance <br /> (Municipal Code Section 24.32),construction activity would be limited to between 7:00 a.m.and <br /> 3:30 p.m.on weekdays.l No construction is proposed on Saturdays,Sundays,or federal holidays. <br /> Discretionary Approvals Required <br /> The following discretionary actions from the City of Redwood City would be required to implement <br /> the proposed modifications. <br /> • Approval of Modifications to the Existing Use Permit. <br /> • Approval of an Architectural Permit. <br /> • Approval of a Sign Permit. <br /> 1 The City's Noise Ordinance permits construction activities between the hours of 7:00 a.m.and 8:00 pm,however <br /> the project applicant has confirmed that construction activities would cease at 3:30 p.m.each day. <br /> Addendum No.2 to the Environmental Impact Report for September 2012 <br /> the Redwood City Costco Wholesale Project 3-6 ICF 00154.12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.