Laserfiche WebLink
7.B. - Page 57 <br /> Redwood City Chapter 4.Environmental Impact Analysis <br /> Table 4.3-2. Existing Intersection LOS <br /> Weekday PM Peak Hour Weekend Midday Peak Hour <br /> LOS Average Delay Average Delay <br /> Intersection Standard LOS (seconds/vehicle) LOS (seconds/vehicle) <br /> Middlefield Road/ E E 73 E 65 <br /> Woodside Road <br /> Middlefield Road/ D C 27 C 21 <br /> Willow Street <br /> Middlefield Road/ D B 14 A 7 <br /> Charter Street <br /> Source: Kittelson&Associates,Inc. 2012a. <br /> Transit <br /> Transit bus service in San Mateo County is provided by the San Mateo County Transit District <br /> (SamTrans) and Caltrain.SamTrans Routes 296,297,and 397 run along Middlefield Road in the <br /> vicinity of the project site. Route 296 provides the regular bus service between the Redwood City <br /> Caltrain station and East Palo Alto.Route 297 provides limited service between the Redwood City <br /> Caltrain station and the Palo Alto Caltrain station.Route 397 provides limited service between <br /> Caltrain stations and Bay Area Rapid Transit(BART) stations. <br /> Caltrain provides commuter rail service between San Francisco and Gilroy.The project site is <br /> located about 1.2 miles east of the Redwood City Caltrain station,which is located in downtown <br /> Redwood City at 1 James Avenue.At the Redwood City station,Caltrain provides service with <br /> approximately 20-to 30-minute headways during the weekday AM and PM commute hours. <br /> Non-Motorized Transportation <br /> Bicycle facilities are classified into three categories: Class I (bike paths) are described as completely <br /> separated,off-street,paved right-of-way(shared with pedestrians) paths,which exclude motor <br /> vehicle traffic; Class II (bike lanes) are striped lanes for one-way bike travel on a roadway; and Class <br /> III (bike routes) are on-street bike routes.There are no bicycle facilities provided on streets in the <br /> project area;however,bike lanes or routes are proposed on Woodside Road and Middlefield Road in <br /> the General Plan (City of Redwood City 2010e). <br /> Sidewalks are found along both sides of Middlefield Road along the project frontage.There are also <br /> pedestrian crosswalks on Middlefield Road at the Willow Street intersection and at the Charter <br /> Street intersection. <br /> Regulatory Setting <br /> Congestion Management Program Compliance <br /> The C/CAG is responsible for maintaining the performance and standards of the Congestion <br /> Management Program (CMP) roadway system.The CMP requires new development projected to add <br /> 100 or more peak hour trips to the CMP roadway network to implement travel demand <br /> management(TDM) measures that would reduce project impacts (C/CAG 2011).Woodside Road/SR <br /> 84 is part of the CMP roadway system;however,the project with proposed modifications would not <br /> Addendum No.2 to the Environmental Impact Report for 4 1Z September 2012 <br /> the Redwood City Costco Wholesale Project ICF 00154.12 <br />