My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-01-14
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-01-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2013 8:49:52 AM
Creation date
1/10/2013 4:10:40 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
1/14/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
662
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.B. - Page 104 <br /> Redwood City Chapter 4.Environmental Impact Analysis <br /> Less-than- <br /> Potentially Significant New Less-than- <br /> Significant Impact with Significant <br /> New Mitigation New No New <br /> 4.9.UTILITIES Impact Incorporated Impact Impact <br /> Would the project: <br /> a. Exceed wastewater treatment ❑ ❑ ❑ � <br /> requirements of the applicable Regional <br /> Water Quality Control Board? <br /> b. Require or result in the construction of ❑ ❑ ❑ � <br /> new water or wastewater treatment <br /> facilities or expansion of existing facilities, <br /> the construction of which could cause <br /> significant environmental effects? <br /> c. Require or result in the construction of ❑ ❑ � ❑ <br /> new stormwater drainage facilities or <br /> expansion of existing facilities,the <br /> construction of which could cause <br /> significant environmental effects? <br /> d. Have sufficient water supplies available to ❑ ❑ ❑ � <br /> serve the project from existing <br /> entitlements and resources,or would new <br /> or expanded entitlements be needed? <br /> e. Result in a determination by the ❑ ❑ ❑ � <br /> wastewater treatment provider,which <br /> serves or may serve the project,that it has <br /> adequate capacity to serve the project's <br /> projected demand in addition to the <br /> provider's existing commitments? <br /> £ Be served by a landfill with insufficient ❑ ❑ � ❑ <br /> permitted capacity to accommodate the <br /> project's solid waste disposal needs? <br /> g. Noncompliance with federal,state,and ❑ ❑ � ❑ <br /> local statutes and regulations related to <br /> solid waste? <br /> Utilities <br /> Impact Discussion <br /> The regulatory environment and existing conditions remain the same as described in the 2007 FEIR. <br /> As discussed below,the proposed modifications to the project would not result in any new or more <br /> severe significant utilities impacts beyond those previously addressed in the 2007 FEIR and 2007 <br /> Addendum No. 1,and there are no other changes in circumstances,or new information that would <br /> necessitate any major modification of the utilities discussions in the 2007 FEIR and 2007 Addendum <br /> No. 1. <br /> Addendum No.2 to the Environmental Impact Report for 4 59 September 2012 <br /> the Redwood City Costco Wholesale Project ICF 00154.12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.