My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-01-14
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-01-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2013 8:49:52 AM
Creation date
1/10/2013 4:10:40 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
1/14/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
662
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.E. - Page 5 <br /> EXHIBIT "A" <br /> SCOPE OF SERVICES AND FEE <br /> Revised Traffic Analysis <br /> Subconsultant (Hexagon) will revise the calculations for the intersection of Middlefield <br /> Road/Woodside Road to reflect planned Caltrans signal timing requirements to the <br /> intersection as well as for the City's planned intersection design modifications that will <br /> be built in spring-summer 2013. The level of service (LOS) calculations will be revised <br /> for Near Term No Project, Near Term Plus Project, Cumulative Without Project, and <br /> Ci.imulative With Project traffic scenarios. The Draft EIR identified significant impacts <br /> at the intersection, so it may be necessary to revise recommended mitigation <br /> measures. <br /> Additional Fee: $1,865 <br /> Revised EIR Transportation Chapter <br /> In collaboration with the Si.ibconsultant, Consultant will revise the EIR <br /> transportation chapter accordingly, including any revised mitigation measures, for <br /> inclusion as Draft EIR Revisions in the Final EIR (section 3). The City will receive <br /> revised EIR pages in the same format as those prepared for the Final EIR, as well <br /> as a separate memo that summarizes the changes. Since the planned <br /> intersection modifications are expected to irriprove traffic conditions at the <br /> intersection, the Consultant's anticipate that recirculation of the Draft EIR will not <br /> be necessary based on any California Environmental Quality Act (CEQA) criterion <br /> (e.g., CEQA Guidelines section 15088.5—Recirculation of an EIR Prior to <br /> Certification). <br /> Additional Fee: $1,160 <br /> Total Additional Fee Requested (A and B above): $3,025. The table below <br /> indicates the anticipated Consultant staff hours and Subconsultant budget <br /> associated with each item described above. <br /> . <br /> - . - ..- • . . . . - . - . . <br /> . . <br /> . . <br /> . . . . <br /> Revised Traffic Analysis 1 $165 0 $0 $165 <br /> RevisedElRTransportation 4 $660 4 $500 $1,160 <br /> Chapter <br /> �� <br /> Hexagon �1,700 <br /> ATTY/AGR/2012/AMENDMENTS/AMEND NO.4 MIG STANFORD IN RWC <br /> REV:12-11-12 VR <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.