My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-01-14
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-01-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2013 8:49:52 AM
Creation date
1/10/2013 4:10:40 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
1/14/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
662
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�7.B. - Page 318 <br /> KL E//VFEL OER <br /> �Bright People.Right Solutions. <br /> May 9, 2012 <br /> Project No. 127119 <br /> Costco Wholesale <br /> 999 Lake Drive <br /> Issaquah, Washington 98027 <br /> Attention: Mr. David Rogers <br /> Subject: Addendum No. 1 to Geotechnical Investigation <br /> Proposed Gasoline Station Expansion <br /> Costco Wholesale Warehouse No. 1042 <br /> 2300 Middlefield Road <br /> Redwood City, California <br /> CW# 11-0054 <br /> References: "Geotechnical Investigation for the Proposed Gasoline Facility (Revised <br /> Location), Costco Redwood City, 2300 Middlefield Road, Redwood City, <br /> California (Warehouse #CW-04-0196)," prepared by Kleinfelder, dated <br /> October 26, 2006. <br /> "Geotechnical Investigation, New Costco Wholesale Store, 2300 <br /> Middlefield Road in Redwood City, California," prepared by Kleinfelder <br /> dated November 15, 2004. <br /> Dear Mr. Rogers: <br /> Kleinfelder West, Inc. (Kleinfelder) has reviewed our above-referenced geotechnical <br /> reports in order to provide an update for the proposed gasoline station expansion at <br /> Costco Wholesale Warehouse No. 1042 located at 2300 Middlefield Road in <br /> Redwood City, California. We understand that Costco plans to add two refueling <br /> islands to the existing gasoline station and extend the existing canopy to the <br /> northeast (project east). This addendum provides updated/supplemental grading, site <br /> drainage, and seismic design parameters for design and construction of the subject <br /> project. The remaining conclusions and recommendations presented in our October <br /> 26, 2006 geotechnical report, which references our November 15, 2004 report, <br /> remain applicable to the project. <br /> RECOMMENDATIONS <br /> Grading <br /> The new refueling islands and canopy will be constructed to the northeast in an area <br /> that is mostly landscaped. In addition, new pavements will be constructed. After the <br /> 127119/IRV12L0328 Page 1 of 3 May 10, 2012 <br /> Copyright 2012 Kleinfelder <br /> 2 Ada,Suite 250, Irvine, CA 92618 p�949.727.4466 f�949.727.9242 <br />
The URL can be used to link to this page
Your browser does not support the video tag.