My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-01-14
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-01-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2013 8:49:52 AM
Creation date
1/10/2013 4:10:40 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
1/14/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
662
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Redwood City Costco Gasoline Expansion ProjE 7.B. - Page 445 <br /> August 4,2011 ruye� <br /> memorandum provides an assessment the transportation and trip generation changes expected to <br /> result from increasing the existing fuel station to 5 islands (20 fueling positions) to determine if an <br /> Environmental Impact Report (EIR) will be necessary for the development proposal from a <br /> transportation perspective and,if so, a reasonable scope for the EIR transportation components. <br /> CONTEXT & HISTORY <br /> The project site is currently developed with a Costco warehouse building and a 3 island (12 fueling <br /> position) Costco Gasoline fuel station. The fuel station was initially approved for development in <br /> 2007 and has been operational since October 2009. The initial project site plans, EIR study, and <br /> approval process completed for the 2007 approval all included and assumed traffic and impact for a 4 <br /> island (16 fueling position) Costco Gasoline facility. However, at the final Conditional Use Permit <br /> (CUP) hearing for the project approval, the Zoning Administrator modified the project and only <br /> approved the project with a 12 fueling position fuel station to address neighborhood concerns related <br /> to traffic congestion,vehicle idling, and queuing at the fuel pumps. <br /> Since the fuel station has been in operation, it's been observed that having only 12 fueling positions is <br /> not sufficient to serve and process the existing demand in an efficient manner.As such, relatively long <br /> queues and wait times are experienced at the fuel station during peak periods because there are not <br /> enough fuel dispensers to efficiently serve the peak demand. Costco is now seeking approval to <br /> expand the fuel station to 5 islands with 20 fueling positions. This study will evaluate what effect the <br /> proposed fuel station expansion will have on overall traffic generation to and from the site, traffic <br /> impacts on the surrounding street network, on-site vehicle queuing and wait times at the fuel station, <br /> and circulation and flow throughout the Costco site. <br /> EXISTING SITE TRANSPORTATION CHARACTERISTICS <br /> A detailed inventory of the site's existing transportation characteristics was collected in May of 2011. <br /> The transportation data was collected before the Memorial Day weekend as requested by the City to <br /> ensure it captured typical peak characteristics with schools in session. Data was collected related to <br /> peak period site driveway traffic counts, peak period on-site traffic counts (at the fuel station and at <br /> key internal site intersections), fuel station queuing, fuel station wait times, and peak periods parking <br /> supply and demand. <br /> Kittelson&Associates,Inc. Boise,Idaho <br />
The URL can be used to link to this page
Your browser does not support the video tag.