My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-01-28
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-01-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2015 4:29:34 PM
Creation date
1/24/2013 6:45:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
1/28/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
807
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.2.A. - Page 1 <br /> RE PO RT <br /> To the Honorable Mayor and City Council <br /> From the Cit Mana er <br /> January 28, 2013 <br /> SUBJECT <br /> Final Acceptance — Pump Station #25 and Additional Pump Station Improvements <br /> P roj ect <br /> RECOMMENDATION <br /> Accept, by motion, the Pump Station #25 and Additional Pump Station Improvements <br /> Project and authorize the release of bonds and retention according to city procedures. <br /> BACKGROUND <br /> On April 23, 2012, Council awarded the construction contract for the rehabilitation of <br /> Pump Station #25 and Additional Pump Station Improvements Project. The <br /> improvements included removing the failing PVC lining inside the wet well and coating it <br /> with polyurethane coating. The flexible coupling vault adjacent to the wet well that <br /> settled was removed and flexible ball joint pipeline was installed on the force mains. At <br /> another sixteen (16) pump stations, each wet well opening was provided with a safety <br /> grate to prevent accidental falls into the wet well. <br /> Construction started in October 2012 and was substantially completed in early <br /> December 2012. Final walkthrough was conducted with PWS staff on December 21, <br /> 2012 and no outstanding items were found; therefore, the project has achieved final <br /> completion. <br /> ANALYSIS <br /> The contract was awarded for a base bid of $153,980. The project was successfully <br /> completed in accordance with the plans and specifications. Change orders were issued <br /> totaling $2,864.04. The final contract amount is $156,844.04 which is 1.9% more than <br /> the initially awarded contract amount. Change orders resulted from additional work <br /> required to field measure the safety grate and providing detail drawings to the <br /> manufacturer. <br /> ALTERNATIVES <br /> Council may choose not to accept the project and/or authorize the release of bonds and <br /> retention which would be contrary to the terms of the contract, prior Council action, and <br /> the public contracting code. <br /> FISCAL IMPACT <br />
The URL can be used to link to this page
Your browser does not support the video tag.