7.A. - Page 92 Pete's Harbor <br /> ���y�� ncuvvvvu vlty EIR Addendum <br /> October 8, 2012 Page 1-5 <br /> (A) The project will have one or more significant etfects not <br /> discussed in the previous EIR or negative declaration; <br /> (8) Significant effects previously examined will be substantially <br /> more severe than shown in the previous EIR; <br /> (C) Mitigation measures or alternatives previously found not to be <br /> feasible would in fact be feasible, and would substantially reduce <br /> one or more significant effects of the project, but the project <br /> proponents decline to adopt the mitigation measure or alternative; <br /> or <br /> (D) Mitigation measures or alternatives which are considerably <br /> different from those analyzed in the previous EIR would <br /> substantially reduce one or more significant effects on the <br /> environment, but the project proponents decline fo adopt the <br /> mitigation measure or alternative. <br /> Based on the information in this report, the City has determined that the necessary changes and <br /> additions to the 2003 EIR identified in this report meet the above CEQA criteria requiring <br /> preparation of an Addendum to the 2003 EIR. This document constitutes that Addendum <br /> (Addendum No. 2 to the 2003 Environmental Impact Report for the Marina Shores Village <br /> Project: Pete's Harbor Residential Community). <br /> 1.3 SUMMARY OF ADDENDUM CONCLUSIONS <br /> Section 2 of this Addendum describes the specific differences between the current Pete's <br /> Harbor project and the 2003 EIR project. Section 3 of this Addendum describes how the <br /> differences between the current Pete's Harbor project and 2003 EIR project affect the impact <br /> and mitigation conclusions of the 2003 EIR. A summary of the revised impacts and mitigation <br /> measures described in section 3 is provided in Table 1.1, which follows on the next page. The <br /> summary table verifies that the revisions incorporated in the current Pete's Harbor project would <br /> not result in new significant environmental effects or a substantial increase in the severity of the <br /> significant effects identified in the certified 2003 EIR. <br /> The 2003 EIR concluded that the Marina Shores Village project proposed at that time would <br /> have resulted in a total of 25 significant unavoidable impacts in the following environmental <br /> areas: <br /> ■ visual factors (5 impacts), <br /> ■ population, housing, and employment (2 impacts), <br /> ■ transportation and circulation (14 impacts), <br /> ■ biological resources (1 impact), <br /> ■ infrastructure and public services (1 impact), <br /> ■ noise (1 impact), and <br /> ■ air quality (1 impact). <br /> Upon certification of the 2003 EIR, however, the City Council determined that some of the <br /> transportation and circulation mitigation measures, while technically feasible, were cost- <br /> prohibitive and would require extensive coordination with State agencies. The Council, <br /> T:1106951Addendumll(10695-01).doc <br />