My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-01-28
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-01-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2015 4:29:34 PM
Creation date
1/24/2013 6:45:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
1/28/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
807
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MIG 7.A. - Page 143 <br /> City of Redwood City EIR Addendum <br /> October 8, 2012 Page 2-6 <br /> The Peninsula Park project evaluated in the 2007 Addendum is now called "One Marina,"which <br /> is under construction. One Marina will include 231 multifamily residential units, which is 565 <br /> fewer units than the 796 units evaluated in the 2007 Addendum. <br /> Figures 2.5 through 2.14 illustrate various aspects of the new Pete's Harbor proposal. Figure <br /> 2.5 is the overall site plan. Figures 2.6 through 2.11 show site plan enlargements and sectional <br /> views, as labeled on Figure 2.5 (e.g., "Site Enlargement A," "Site Enlargement B"). Figures <br /> 2.12 through 2.14 include building sections and elevations. In particular, Figure 2.12 (Current <br /> Pete's Harbor Project--Building Sections A and B) shows that the maximum height of the <br /> proposed buildings would be 75 feet, which would be the rooftop of the parking garage (see <br /> Building 1 on Figure 2.5). The 5-story apartment building wrapping around the parking garage <br /> would be a maximum 70 feet in height. The 3-story 10-plex buildings (see Buildings 2 through <br /> 11 on Figure 2.5, plus Figure 2.14) would be a maximum 40 feet, 6 inches in height. <br /> Table 2.1 provides a land use summary for the current Pete's Harbor project, including the <br /> proposed number of acres in each land use, breakdown of residential unit types, maximum <br /> building heights, and other quantitative information. Table 2.2 provides a summary comparison <br /> of the current Pete's Harbor project with the 2003 EIR project. As shown in the tables, the <br /> current Pete's Harbor project application proposes a reduced development program for the <br /> Pete's Harbor site in comparison to the 2003 EIR project. <br /> 2.2 2003 EIR PROJECT AND PROJECT ALTERNATIVES <br /> The portion of the 2003 EIR project located within the 13.85-acre Pete's Harbor property <br /> consisted of approximately 633 housing units in an array of five 21-story residential towers (up <br /> to 240 feet in height), and numerous low-rise residential flats and townhouses, plus <br /> approximately 1.66 acres of marina (reduced from the existing 3.18 acres). <br /> As required by CEQA, the 2003 EIR also included a description and comparative evaluation of a <br /> range of alternatives to the project. Nine alternatives were described and evaluated. One of the <br /> alternatives, Alternative 6, was formulated to represent the actual, revised intentions of the <br /> applicant. Alternative 6 included project revisions to reduce EIR-identified visual, traffic, and <br /> biological impacts and improve project waterfront relationships. The Alternative 6 revisions <br /> included a reduction in maximum building height to 21 stories (236 feet), an enlarged 25,000- <br /> square-foot retail component (to "internalize" more vehicular trips), a 200-room hotel, and transit <br /> and transportation demand management (TDM) provisions to reduce peak period vehicular <br /> trips. Because Alternative 6 was assumed to represent the revised intentions of the applicant, <br /> its design characteristics and comparative impacts and mitigating effects were described in <br /> greater detail in the Alternatives chapter of the 2003 EIR in order to provide adequate CEQA <br /> documentation (i.e., minimize the need for supplemental CEQA documentation) should the City <br /> elect to approve this or a similar alternative.' The project variation approved by the City in June <br /> 2004 (see paragraph 4 in section 2.1 above) was similar to Alternative 6. <br /> 'February 2003 Draft EIR, page 17-5. <br /> T.•1106951Addenduml2(10695-01).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.