My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-01-28
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-01-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2015 4:29:34 PM
Creation date
1/24/2013 6:45:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
1/28/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
807
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MIG 7.A. - Page 167 <br /> City of Redwood City cir�Haaenaum <br /> October 8,2012 Page 3-2 <br /> (C) Mitigation measures or alternatives previously found not to be <br /> feasible would in fact be feasible, and would substantially reduce <br /> one or more significant effects of the project, but the project <br /> proponents decline fo adopt the mitigation measure or alternative; <br /> or <br /> (D) Mitigation measures or alternatives which are considerably <br /> different from those analyzed in the previous EIR would <br /> substantially reduce one or more significant effects on the <br /> environment, but the project proponents decline to adopt the <br /> mitigation measure or alternative. <br /> In accordance with the CEQA Guidelines sections 15164 and 15162, for each environmental <br /> topic addressed in the 2003 EIR (e.g., land use, visual factors, transportation and circulation, <br /> biological resources), the discussion in this Addendum chapter indicates whether: <br /> • changes or additions to the previously certified 2003 EIR for the Marina Shores Village <br /> project (2003 EIR) are necessary to adequately address the impacts and mitigation <br /> measures of the current Pete's Harbor project, and if yes, whether: <br /> • the changes result in new significant environmental impacts or a substantial increase in the <br /> severity of the significant impacts identified in the 2003 EIR; <br /> ■ the changes require new mitigations not identified in the 2003 EIR that the applicant <br /> declines to adopt; or <br /> ■ changes have occurred since 2003 in the project circumstances (environmental setting) with <br /> respect to the environmental issue which result in new significant environmental impacts or <br /> a substantial increase in the severity of a previously identified significant impact. <br /> For some of the environmental impacts identified as "significant" in the 2003 EIR, this <br /> Addendum concludes that the changes included in the current Pete's Harbor project would <br /> result in a reduced but still "significant" impact and would therefore still warrant associated <br /> similar or reduced mitigation measures in order to reduce the impact to a "less-than-significant" <br /> level. <br /> For other environmental impacts identified as "significant" in the 2003 EIR, this Addendum <br /> concludes that the changes included in the current Pete's Harbor project, or changes in project <br /> circumstances since certification of the 2003 EIR, would reduce the impact to a "less-than- <br /> significant" level or avoid the impact all together, thereby eliminating the need for mitigation. <br /> All such conclusions in this Addendum pertaining to remaining mitigation requirements will be <br /> incorporated by the City into an updated (2012) Mitigation Monitoring and Reporting Program <br /> (MMRP) for the Pete's Harbor project. <br /> T.•1106951Addenduml3(10695-01).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.