My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-01-28
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-01-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2015 4:29:34 PM
Creation date
1/24/2013 6:45:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
1/28/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
807
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.A. - Page 184 Pete's Harbor <br /> ���y �� ��������� ���� EIR Addendum <br /> October 8, 2012 Page 3-21 <br /> Conclusion. The height and building mass impact analysis and determinations for the <br /> Peninsula Park project (2007 Addendum) also apply to the current Pete's Harbor project <br /> because: (1) the Pete's Harbor component and Peninsula Marina/Peninsula Park component <br /> collectively comprised the Marina Shores Village project, which per CEQA was analyzed as one <br /> project in the 2003 EIR; and (2) both properties are located on Bair Island and contribute to the <br /> visual environment in the vicinity. The 2007 Addendum (Mitigation 5-2-1) concluded that <br /> reducing the maximum building height for all Marina Shores Village project buildings to 75 feet-- <br /> consistent with City zoning limitations--would result in a less-than-significant impact on views, <br /> vistas, and the character of the surrounding area. The currently proposed Pete's Harbor project <br /> meets this performance standard; therefore, 2003 EIR Mitigation 5-2, as revised by Addendum <br /> No. 1, is no longer required. The impact of the current Pete's Harbor project on views, vistas, <br /> and the character of the surrounding area would be less-than-significant. <br /> Impact 5-3 Analysis: General Visual Compatibility Impact. The 2003 EIR identified a <br /> significant visual compatibility impact resulting from the project-related substantial increase in <br /> height, mass, scale, and intensity of development on the East Bayshore Boulevard vicinity. <br /> Similar to Impacts 5-1 and 5-2, the associated 2003 EIR mitigation for Impact 5-3 described two <br /> options: Mitigation 5-3-1, reduction of all project buildings to 50 feet or less in height (to <br /> conform with the existing visual base plane and general scale of existing development), or <br /> Mitigation 5-3-2, preparation of a Precise Plan subject to various discretionary reviews and <br /> approvals by the City. <br /> At 75 feet in height, the current Pete's Harbor project's tallest building (the parking garage) <br /> would be about 25 feet taller than the nearby Bayport Marina Plaza office building (across Bair <br /> Island Road south of the project site) and the Villas at Bair Island multifamily development <br /> (adjacent to the project site on the south). At up to 40.5 feet, the current project's other multi- <br /> story buildings would be of similar height to these nearby buildings. <br /> Conclusion. The height and building mass impact analysis and determinations for the <br /> Peninsula Park project (2007 Addendum) also apply to the current Pete's Harbor project <br /> because: (1) the Pete's Harbor component and Peninsula Marina/Peninsula Park component <br /> collectively comprised the Marina Shores Village project, which per CEQA was analyzed as one <br /> project in the 2003 EIR; and (2) both properties are located on Bair Island and contribute to the <br /> visual environment in the vicinity. The 2007 Addendum (Mitigation 5-3-1) concluded that <br /> . reducing the maximum building height for all Marina Shores Village project buildings to 75 feet-- <br /> consistent with City zoning limitations--would result in a less-than-significant visual compatibility <br /> impact. The currently proposed Pete's Harbor project meets this performance standard; <br /> therefore, 2003 EIR Mitigation 5-3, as revised by Addendum No. 1, is no longer required. The <br /> visual compatibility impact of the current Pete's Harbor project would be less-than-significant. <br /> Impact 5-4 Analysis: Potential Light and Glare Impacts. The 2003 EIR indicated that <br /> project lighting (interior and exterior) could create light and glare impacts on surrounding <br /> properties and recreational areas, and potential for daytime glare off project tower windows <br /> could cause a nuisance and associated potentially significant visual impact. The associated <br /> mitigation described the need for strategically designed lighting and screening, possible <br /> reductions in building heights, and tinted windows in taller buildings. <br /> The current Pete's Harbor project would result in substantially reduced light and glare impacts. <br /> The extent of tower buildings visible above the base plane level--and therefore the amount of <br /> visible building illumination--would be reduced by approximately 50 percent from the 2003 EIR <br /> T:1106951Addenduml3(10695-01).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.