My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-01-28
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-01-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2015 4:29:34 PM
Creation date
1/24/2013 6:45:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
1/28/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
807
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MIG 7.A. - Page 187 <br /> City of Redwood City ",, ,. <br /> October 8, 2012 Page 3-24 <br /> assumed that the project could still have a significant visual impact related to consistency with <br /> City urban design objectives. <br /> Conclusion. Modified impact and mitigation. The impact and mitigation identified in the 2003 <br /> EIR for Impact 5-6 remain applicable to the current Pete's Harbor project, and the mitigation <br /> remains sufficient to reduce this impact to a less-than-significant level. In addition, the <br /> mitigation has been modified as follows: (1) 2003 EIR references to the Peninsula Marina <br /> property are no longer applicable and have been removed, and (2) other text changes have <br /> been made consistent with the current Pete's Harbor project design (e.g., there are no longer <br /> any "residential towers"). City staff and the project applicant are continuing to refine the project <br /> architectural and landscape design details to implement this mitigation. <br /> Impact 5-7 Analysis: Internal Visual Relationships of Project Development to Electrical <br /> Transmission Lines. The 2003 EIR indicated that the closest project residences could be <br /> adversely impacted by views of the existing nearby PG&E transmission lines and towers. The <br /> associated mitigation included minimum building setbacks from the PG&E easement, public <br /> disclosure of these relationships in sales materials, and strategic on-site landscaping. <br /> As discussed in section 3.1 (Land Use) of this Addendum under Impact 4-1 (Project <br /> Relationships to Existing Overhead Electrical Transmission Lines), this impact no longer applies <br /> to the currently proposed Pete's Harbor project because: (1) the Peninsula Marina/Peninsula <br /> Park/One Marina component is no longer part of the project, and (2) none of the Pete's Harbor <br /> buildings would be located within 200 feet of the transmission lines. <br /> Conclusion. Mitigation 5-7 is no longer required. The internal visual relationships of the <br /> current Pete's Harbor project to the existing electrical transmission lines would be less-than- <br /> significant. <br /> T.•1106951Addenduml3(10695-01).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.