MiG 7.A. - Page 193 <br /> City of Redwood City EIR Addendum <br /> October 8,2012 Page 3-30 <br /> (TDM) program. Due to various identified physical constraints (e.g., right-of-way limitations) <br /> and other feasibility factors (some mitigations were considered beyond the scope of a single <br /> development project), full mitigation of the roadway system operational impacts listed above to <br /> less-than-significant levels was determined in the 2003 EIR to be infeasible; therefore, the <br /> project traffic impacts listed above (Impacts 7-1 through 7-6) were determined to be significant <br /> and unavoidable. <br /> Traffic generated by the current Pete's Harbor project plus the One Marina project "project <br /> condition"' would not result in any of the significant impacts identified above (Impacts 7-1 <br /> through 7-6) for the 2003 EIR "project condition." All of these 2003 EIR-identified "project <br /> condition" impacts would be reduced to a less-than-significant level under the current "project <br /> condition." <br /> Conclusion. Mitigations 7-1 through 7-6 are no longer required. All these impacts would be <br /> less-than-significant. <br /> Impacts 7-7 through 7-10 Analysis: Project Impacts on Transit Accessibility, Pedestrian <br /> Accessibility, Bicycle Accessibility, and Emergency Access. The 2003 EIR also identified <br /> significant impacts resulting from the 2003 project on the following: <br /> ■ Transit accessibility (Impact 7-7); <br /> ■ Pedestrian accessibility (Impact 7-8); <br /> ■ Bicycle accessibility (Impact 7-9); and <br /> ■ Project emergency access (Impact 7-10). <br /> In order to reduce the above identified impacts to less-than-significant levels, the 2003 EIR <br /> recommended incorporation into the project of a bus turnaround (for Impact 7-7), adequate <br /> pedestrian sidewalks and paths (for Impact 7-8), and adequate bicycle facilities (for Impact 7-9), <br /> and the extension of Blomquist Street over Redwood Creek to the East Bayshore Road/Bair <br /> Island Road intersection, which was partially funded at the time (for Impact 7-10). <br /> Conclusion. Mitigations 7-7 through 7-9 are no longer required because either: (1) the One <br /> Marina project currently under construction will implement the mitigations as applicable to its <br /> property (Mitigations 7-7 through 7-9), and (2) the current Pete's Harbor project has <br /> incorporated the applicable components into its plans (Mitigations 7-8 and 7-9). Mitigation 7-10 <br /> is no longer required for emergency access because combined development of Pete's Harbor <br /> and One Marina would total 642 new dwelling units, which is under the conservative threshold <br /> of 750 new units. However, the Blomquist Street Extension is assumed to be completed under <br /> the Cumulative Conditions (year 2020) traffic scenario and, therefore, was included in the 2003 <br /> EIR cumulative traffic impact analysis as well as the cumulative traffic evaluation in this <br /> Addendum. <br /> 'The "project condition" is defined as roadway system operational conditions under Background <br /> Conditions (i.e., existing traffic plus traffic from recently approved or currently under-construction new <br /> developments) plus traffic from the proposed project. The 2003 EIR "project condition" included the <br /> proposed Marina Shores Village development of both the Pete's Harbor and Peninsula Marina properties. <br /> T.•1106951Addenduml3(10695-01).doc <br />