My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-01-28
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-01-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2015 4:29:34 PM
Creation date
1/24/2013 6:45:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
1/28/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
807
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.A. - Page 236 <br /> MEG Pete's Harbor <br /> City af Redwood Ci#y EIR Addendum <br /> October'!0, 2012 Page 3-45 <br /> impacts to a less-than-significant �e�el, fmpact 10-1 should be identif ied as significan#and <br /> una�oidable "unt�l an achi e�able water suppEy sourced is identified." Mitigation 10-1 described <br /> the State requirement for a subsequent water supply analysis, reflecting City progress on its <br /> water supply and conser�ation strategies. Ths current Pete's Harbar project water cEemand is <br /> already factored into the City's most recertt UWMP {which was adopted in 2010, after the 2003 <br /> praject), and the impact on water service demand would be less-than-significant. Mitigatian 10- <br /> 1 �s no Eanger required. <br /> Impact 90-2 Analysis: Prnject-Related and Cumulative Impac#s on Sewage Treatment <br /> and Transmission Capacity. <br /> As discussed in the 20Q3 EIR, the Marina Shares Village praject wauld have generated a net <br /> Encrease of approximately 317,OOD gallons of wastewater per day (gp�), wi#h the pre�ious Pete's <br /> Harborcomponent contributing abaut 105,000 gallons of that net increase. Based an the same <br /> formuia fram the 2Qa3 E1R, the currentiy praposed !'ete's Harbor project would generate a net <br /> increase of approximate�y 64,000 gpd, approximately 60 percent of the previous Pete's Harbor <br /> wastewater generation. [some texf has been delet�d] <br /> Conclusion. Redwood City Engineering staff ha�e determined that sewage treatment ar�d <br /> transmission capacity exists far the current Pete's Harbor project due to current, impro�ed <br /> conditions, including substan#ial ongoing w ater conservation efforts and improvements <br /> throughout the city, as well as sewage treatment and transmission capacity impro�ements <br /> implemented as part of the One Marina de�elopmen# ("Peninsula Marina" in the 2003 EIR) <br /> under cor�struction south of the Pete's Harbor site. Unfi ke in 2003, the City no lor�ger exceeds <br /> its Stage 1 treatment a(�ocation from the South Bayside System Authority (SBSA). The impact <br /> on treatment and transmissian capacity would be less-than-signrfrcanf Mifigation 10-2 is no <br /> Eonger required. <br /> Impact 10-3 Analysis: Project-Related Increase in Police Service Demands. The certified <br /> 2003 EIR concluded that buildout af the Marina Shores Viflage project would have required <br /> approxima#efy four additionai sworn palice officers and requisite trainir�g, support staff, facilit�es, <br /> and equipmenf (based oR an estimated on-site net papufation increase of 3,910 residents). The <br /> current Pete's Harbor project woufd result in a net papulation increase n f approximately 745 <br /> residents' (i.e., an 80 percent reduction from the pre�ious Marina Shores Vilfage estimate) and <br /> a proportional reduction in the need for additional police services. Therefore, the current Pet�'s <br /> Harbor project wauld require the equivalent af about O.S adclitional swarn officers, which <br /> generally wou�d be funded from project property taxes. <br /> Conclusian. Modified impac#and mitigation. Impact and Mitigation 10-3 have been modified to <br /> reffect the reduced project. Aithough the current Pete's Harbor project would result in reduced <br /> demands for additional police services, the 2�03 EIR-required mitigation--completion of a <br /> staffing survey, etc.--r�mains applicabfe to the c�rrent Pete's Harbor �roject and remains <br /> sufficient to reduce this impact ta a les�-than-srgnrficant level. <br /> 'The Pete's Harbor property is estimated to have 110 current re5idents ($55- 110 =745 on-site net <br /> population increase). <br /> T I106951Addenduml3(]0695-01f-rev doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.