My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt13 Carollo Engineers, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2013
>
Agmt13 Carollo Engineers, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2016 8:22:18 AM
Creation date
2/7/2013 12:52:00 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Carollo Engineers, Inc.
PROJECT NAME
Design, bid support and construction services for the Bair Island Storm Pump Station
RMP File Number
304
Date
2/7/2013
MO Ref
13-019, 15-187
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
U1BOR AND COST ESTIMATE <br /> Other Direct Costs(ODG) <br /> PM PE MECH STRUC E&IC CAD WP Total Labor Subconsultants PECE Mileage�Z� ODC Total <br /> Task Description $259 $215 $215 $21S $215 $139 $96 Hours Cost Name Amount $10 Printin Trips Amount Cost Casi <br /> $0 <br /> 7A Design Engineering Support During Construction <br /> Review and respond to Submittals,5hop <br /> 7.1 drawings,RFis,Change Orders,Ciaims 10 20 30 10 30 7 5 112 $23,393 $1,120 $0 0 $0 $1;120 $24,513 <br /> 7.2 Provide Final Record Drawings 2 16 4 4 8 40 0 74 $12,958 $740 $250 0 $0 $990 $13,948 <br /> 7.3 PLC Startup 2 2 4 $860 Edco' $3,300 $40 $3,340 $4,200 <br /> Other Pump Station Startup and commissioning <br /> 7.4 assistance 1 6 8 17 $3,699 $170 2 $92 $262 $3,961 <br /> 7.5 As needed,site visits and construction meetings 4 11 4 4 4 27 $5,981 $270 6 $276 $546 $6,527 <br /> Task 7.0 Totais 17 49 46 18 52 47 5 234 546,891 $3,300 $2,340 $250 a8 $368 $6,258 ;53,149 <br /> 8A Additional construction issue resolution <br /> 8.1 As needed,SVCW force main resolution 12 8 4 2 26 $5,880 $2fi0 $260 $6,140 <br /> As needed,construction problem resolution and <br /> 8.2 assistance 4 8 3 3 18 $4,046 $180 $180 $4,228 <br /> Task 8.0 Totals 16 16 3 d 3 0 2 44 59,926 $0 5440 a0 $0 $0 $440 $1U,366 <br /> Totai(Tasks 7 thru 8)= 33 65 49 22 55 47 7 278 56,817 53,300 $2,780 5250 $8 $368 $6,698 $63,515 <br /> Legend: <br /> PM Project Manager <br /> PE Project Engineer <br /> MECH Mechanicai Engineer (1)Project Equipment and Communication Expense. <br /> STRUC Structural Engineer (2)Based on 110 miles er round tri <br /> p p @$0.56/mile. <br /> E&IC Electrical and Instrumentation Engineer <br /> CAD CAD Technician <br /> WP Word Processing/Clerical <br /> ATTY/AGR.2012206lCaroilo Engineers,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.