My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-02-11
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-02-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2013 9:00:23 AM
Creation date
2/7/2013 3:10:14 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
2/11/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
331
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.1. - Page 13 <br /> Product: Draft CEQA Environmental Checklist Form/Initial Study (CEQA <br /> Appendix G)--all environmental topic areas, Mandatory Findings of Significance, � <br /> and Determination <br /> Alternatively, should the City, upon consultation with the Consultant, determine the <br /> project evaluation is better served by the CEQA streamlining provisions as <br /> described in SB226/Public Resource Code 21094.5 and CEQA Guidelines 15183.3 <br /> et seq. then the Consultant shall prepare a draft CEQA Environmental Checklist <br /> Form/Initial Study per CEQA Appendix N. <br /> Task 3. Review Draft Initial Studv With City Staff <br /> Consultant and City staff, including the City Attorney and/or City's CEQA attorney if <br /> desired by the City, will review the draft Initial Study. Based on the draft Iriitial Study <br /> conclusions and team review, the team will decide, if necessary, what project <br /> changes or additional project conditions could be imposed to mitigate or avoid <br /> impacts identified in the DTTP EIR so that the City can approve the project as being <br /> within the scope of the DTPP EIR. As a result of the team review, Consultant will - <br /> revise the draft Initial Study. <br /> If the team ultimately concludes that a Mitigated Negative Declaration, Supplemental <br /> EIR, Subsequent EIR or other CEQA documentation is required, Consultant will <br /> prepare a concise work scope, schedule, and budget for the additional CEQA work. <br /> Products: Revised Initial Study based on team review; If necessary, concise <br /> work scope/schedule/budget for additional CEQA work <br /> ATTY/AGR/2013.017/M IG <br /> REV:02-05-13 VR <br /> Page 11 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.