My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-02-11
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-02-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2013 9:00:23 AM
Creation date
2/7/2013 3:10:14 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
2/11/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
331
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.B. - Page 16 <br /> TASK 4 — SURFACE POTENTIAL PROFILE & DATA ANALYSIS <br /> • Consultant shall perform a surface potential profile over the selected sections of <br /> the water transmission pipeline in accordance with NACE Standard SP0207- <br /> 2007 entitled "Performing Close-Interval Potential Surveys and DC Surface <br /> Potential Gradient Surveys on Buried or Submerged Metallic Pipelines". GPS <br /> coordinates and markings in the field will be used to record the locations of <br /> potential anodic peaks along the section of pipeline being surveyed. Side drains <br /> and remote reference electrodes will be utilized to confirm potential anodic <br /> locations where necessary. <br /> • After completion of the surface potential profile and the data analysis, consultant <br /> shall select two locations for excavation and further analysis via direct <br /> assessment. <br /> TASK 5 — PIPELINE DIRECT ASSESSMENT <br /> • Consultant shall collect the following information at each excavation location: <br /> • Soil sample collected for chemical analysis <br /> • Ultrasonic thickness measurements will be made around the entire <br /> circumference of the pipe in order to determine the remaining wall <br /> thickness at each location. <br /> • Quantity and depths of corrosion pits will be documented. A three- <br /> dimensional view of the surface of the pipe can be developed if <br /> desired. <br /> • Degree of graphitization will be determined. <br /> • Prior to inspection of the exposed pipe, the City will sand blast the exposed <br /> section of pipe to remove all graphitized ductile and cast iron from the surface of <br /> the pipe. <br /> TASK 6 — TECHNICAL MEMORANDUM <br /> • Consultant shall prepare a technical memorandum at the conclusion of the field <br /> testing for each phase that contains a listing of all field data collected and an <br /> analysis of this data. Recommendations for any follow-up work including <br /> additional confirmatory excavations and non-destructive testing for the pipeline <br /> will be made as warranted. Consultant shall provide opinion as to the overall <br /> condition of the subject water transmission pipeline and its useful life expectancy <br /> will be provided along with recommendations for life extension strategies and the <br /> estimated costs associated with each strategy. A schedule for the <br /> implementation of any life extension strategies will also be recommended. <br /> TIME SCHEDULE: <br /> ATTY/AGR/2013.014/JDH CORROSION CONSULTANTS, INC. <br /> REV:01-25-13 VR <br /> Page 12 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.