My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-02-25
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-02-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2013 11:48:07 AM
Creation date
2/25/2013 8:59:05 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
2/25/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.D. - Page 6 <br /> 4. Consultant shall attend up to three meetings with the Water Board in support of the project. <br /> TASK 2 DELIVERABLE: <br /> • Prepare a Summary Report for submittal to the Water Board <br /> • Additional Water-Quality sample results from Bayfront Canal and Atherton Channel. <br /> TASK 4: RESPONSE TO WATER BOARD COMMENTS <br /> 1. This task is an allowance for the potential need for the Consultant to respond to <br /> comments from the Water Board regarding the Summary Report <br /> TIME SCHEDULE: <br /> All deliverables will be submitted no later than two weeks after completion or as soon as <br /> practicable. <br /> ATTY/AGR/2013/AMENDMENTS/AMEND N0.2 MOFFAT NICHOL <br /> REV:02-05-13 VR <br /> Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.