My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2013-017252
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Improvement Agreement
>
RecDoc 2013-017252
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2013 2:25:32 PM
Creation date
2/27/2013 4:38:11 PM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
Improvement Agmt One Marina
Doc Num
2013-017252
Rec Date
1/31/2013
Address
One Marina RWC, CA 4063
Parties
RC Peninsula Park, LLC
Reso Ref
PC Reso 12-24
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. City and Developer desire to enter an agreement providing for the construction and <br /> installation of the Improvements in accordance with the Improvement Plans. <br /> AGREEMENT <br /> NOW, THEREFORE, in consideration of the faithful performance of the terms and conditions set <br /> forth in this Agreement,the parties hereto agree as follows: <br /> 1. pur�ose. The purpose of this Agreement is to guarantee completion of the Improvements <br /> and ensure satisfactory performance by Developer of Developer's obligations to satisfy the Conditions <br /> pertaining to the Improvements. <br /> 2. Proper� Subiect to Agreement. The Property shall be subject to this Agreement. <br /> 3. Duty to Install Improvements. Developer will construct, install and complete, or cause to <br /> be constructed, installed and completed, at the Developer's sole cost and expense, the Improvements, in <br /> accordance with the Improvement Plans (defined in Recital E. above) and to the satisfaction of the City <br /> Engineer, in his reasonable discretion. Developer will also supply all labor and materials therefor, all in <br /> strict accordance with the terms and conditions of this Agreement. The Improvements shall include, but <br /> are not necessarily limited to, all of the following: <br /> (a) grading,paving <br /> (b) curbs, gutters, concrete walkways, driveways <br /> (c) sanitary sewer system, complete <br /> (d) permeable pavers <br /> (e) water system, complete <br /> (fl storm drainage system, complete <br /> (g) site lighting system, complete <br /> (h) street trees <br /> (i) landscaping and irrigation system complete <br /> (j) utility joint trenching <br /> (k) all conditions of approval for Tentative Subdivision Map entitled "Vesting Tentative <br /> Map, One Marina Lot 3,"heretofore issued for said subdivision, <br /> (1) and all other work, improvements, or construction required by or mentioned in the <br /> abovementioned plans and specifications, conditions of permits and all construction, <br /> appurtenances and improvements necessary as reasonable determined by the City <br /> Engineer to complete the aforementioned improvements, both within and outside of <br /> the abovementioned subdivision. <br /> The construction, installation and completion of the Improvements and all labor and materials furnished <br /> in connection therewith are hereinafter referred to collectively as the "Work." The Work and <br /> ATTY/AGR/2013.009/SUBDIVISION IMPROVEMENT AGREEMENT ONE MARINA <br /> REV:01-14-13 VR Page 2 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.