Laserfiche WebLink
Other information that is critical to the overall analysis of the pipeline and the <br /> surface potential profile is as follows: <br /> • Locations of blow-offs and ARV's and the type of piping used for blow- <br /> offs and ARV's. Is the piping made out of copper piping or cast or <br /> ductile iron piping and is it coated or bare. Also if it is constructed out <br /> of copper piping is it electrically isolated from the transmission main <br /> through use of insulating bushings or is it electrically coupled to the <br /> water main. <br /> • Locations of in-line valves and whether they are coated or bare. <br /> • Locations of fire hydrants and the type of pipe connecting the water <br /> main to the fire hydrant. <br /> • Locations of any casings or manholes and how they are constructed. <br /> • Crossings with any gas pipelines or other foreign pipelines that may <br /> have cathodic protection systems. <br /> TASK 2 —SOIL CORROSIVITY PROFILE & CENTERLINE MARKING <br /> • Consultant shall review soil records from geotechnical reports available from the <br /> City of this pipeline alignment as well as from adjacent housing developments. <br /> Consultant shall also review soil type data from the US Geologic Survey. <br /> • Consultant shall measure in-situ soil resistivities at an interval of 250 feet <br /> (approx.) at depths of 2.5 ft., 5.0 ft., 7.5 ft. and 10 ft. and use Barnes Layer <br /> calculations to determine the resistivities at pipe depth along this pipeline <br /> alignment. <br /> • While conducting the soil corrosivity, profile consultant shall locate and mark the <br /> center line of the pipeline using a combination of inductive and conductive pipe <br /> locators in combination with visible pipeline appurtenances. White temporary <br /> paint will be utilized for centerline marking in asphalt locations and flags will be <br /> utilized in dirt or unimproved locations. <br /> • Consultant shall prepare a map of the pipeline alignment indicating the variations <br /> in soil corrosivity along the alignment. This data will be used in selecting the <br /> locations to perform the surface potential profiles. <br /> TASK 3 —SELECTION OF PIPE SEGMENTS FOR SURFACE POTENTIAL PROFILE <br /> • Consultant shall review alignment soil corrosivity profile and the other data <br /> collected during the documentation review phase of this project and select <br /> locations for conducting surface potential profiles. Surface potential profiles <br /> locations will be selected at areas analyzed to be of highest risk for each section <br /> of this water transmission pipeline. <br /> ATTY/AGR/2013.014/JDH CORROSION CONSULTANTS,INC. <br /> REV:01-25-13 VR <br /> Page 11 of 17 <br />