My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-03-11
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-03-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2013 4:28:35 PM
Creation date
3/7/2013 4:37:19 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
3/11/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
921
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.A. - Page 161 �/�/holesale Redwood City GDF Expansion <br /> Air Quality/Climate Change Analysis <br /> Page 27 <br /> Standard Conditions and Mitiqation Measures <br /> This Section updates the Standard Conditions and Mitigation Measures discussion presented in <br /> Section 4.5.4 of the 2007 Certified EIR. <br /> Standard Conditions. <br /> For all projects, the Bay Area AQMD recommends implementing all Basic Construction <br /> Mitigation Measures, listed in Table 18 below, to meet the District's best management practices <br /> threshold for fugitive dust, whether or not construction-related emissions exceed applicable <br /> thresholds. <br /> Table 18. Bay Area AQMD Recommended Basic Construction Mitigation Measures for All <br /> Proposed Projects. <br /> Item Measure <br /> 1. All exposed surfaces (e.g., parking areas, staging areas, soil piles, graded areas, and <br /> unpaved access roads) shall be watered two times per day. <br /> 2. All haul trucks transporting soil, sand, or other loose material off-site shall be covered. <br /> 3. All visible mud or dirt track-out onto adjacent public roads shall be removed using wet <br /> power vacuum street sweepers at least once per day. The use of dry power sweeping <br /> is prohibited. <br /> 4. All vehicle speeds on unpaved roads shall be limited to 15 mph. <br /> 5. All roadways, driveways, and sidewalks to be paved shall be completed as soon as <br /> possible. Building pads shall be laid as soon as possible after grading unless seeding <br /> or soil binders are used. <br /> 6. Idling times shall be minimized either by shutting equipment off when not in use or <br /> reducing the maximum idling time to 5 minutes (as required by the California airborne <br /> toxics control measure Title 13, Section 2485 of California Code of Regulations <br /> [CCR]). Clear signage shall be provided for construction workers at all access points. <br /> 7. All construction equipment shall be maintained and properly tuned in accordance with <br /> manufacturer`s specifications. All equipment shall be checked by a certified visible <br /> emissions evaluator. <br /> 8. Post a publicly visible sign with the telephone number and person to contact at the <br /> lead agency regarding dust complaints. This person shall respond and take corrective <br /> action within 48 hours. The Air District`s phone number shall also be visible to ensure <br /> compliance with applicable regulations. <br /> (Source: BAAQMD, 2011b, Section 8.1.2.) <br /> Mitigation Measures. <br /> No additional mitigation measures are recommended or required to reduce air quality or climate <br /> change impacts to less than significant. <br /> 7/30/2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.