Laserfiche WebLink
Prop 7.A. - Page 171 dwood City GDF Expansion <br /> Air�ua���y�������a«���a��y�,�,��alysis <br /> Appendix A: Construction Emission Calculations <br /> Table A-2. Construction Emissions-Fugitive Dust Sources. <br /> Construction Fugitive Dust Duration Emissions(Pounds per Day) <br /> Phase/Task Resources Activity Quantity (Days) Fugitive PM�o Fugitive PM2.5 <br /> Phase 1: Demolition/Site Preparation. <br /> Concrete/Industrial Saws -- -- 2 -- -- <br /> a.Temporary Fencing, Rubber Tired Loaders Material Handling 200 tons 2 0.01 0.00 <br /> Asphalt Removal 10-ton Dump Trucks(20 loads) -- -- 2 -- -- <br /> Labor -- -- 2 -- -- <br /> Task Subtotal: 0.01 0.00 <br /> Rubber Tired Loaders Material Handling 200 tons 3 0.01 0.00 <br /> b.Sub-grade Earthwork Tractors/Loaders/Backhoes Grading 0.71 miles 3 0.37 0.04 <br /> 10-ton Dump Trucks(20 loads) -- -- 3 -- -- <br /> Labor -- -- 3 -- -- <br /> Task Subtotal: 0.37 0.04 <br /> c.Relocate Storm Drain Tractors/Loaders/Backhoes Bulldozing 16 hours 3 4.01 2.21 <br /> Labor -- -- 3 -- -- <br /> Task Subtotal: 4.01 2.21 <br /> d.Initial Concrete Work- Tractors/Loaders/Backhoes Bulldozing 16 hours 5 2.41 1.32 <br /> Retaining Wall, Footings, Concrete Trucks(4 loads) -- -- 5 -- -- <br /> Curbs Labor -- -- 5 -- -- <br /> Task Subtotal: 2.41 1.32 <br /> Phase 2: Fuel S stem,Pavin ,Cano <br /> a.Fuel System Labor -- -- 10 -- -- <br /> Rubber Tired Loaders Material Handling 400 tons 3 0.01 0.00 <br /> b.Paving: Prepare Base Base Delivery Trucks(40 loads) -- -- 3 -- -- <br /> Labor -- -- 3 -- -- <br /> Task Subtotal: 0.01 0.00 <br /> c.Paving: Concrete Apron Concrete Trucks(9 loads) -- -- 2 -- -- <br /> Labor -- -- 2 -- -- <br /> Task Subtotal: -- -- <br /> Pavers -- -- 2 -- -- <br /> d.Paving: Asphalt SurFaces Rollers -- -- 2 -- -- <br /> Labor -- -- 2 -- -- <br /> Task Subtotal: -- -- <br /> e.Canopy Installation and Forklifts -- -- 15 -- -- <br /> Finishes Generator Sets -- -- 15 -- -- <br /> Labor -- -- 15 -- -- <br /> Task Subtotal: -- -- <br /> f.Landscaping/Striping Air Compressors -- -- 5 -- -- <br /> Labor -- -- 5 -- -- <br /> Task Subtotal: -- -- <br /> Summary: <br /> Maximum Phase Daily Emissions(pounds/day) 4.01 2.21 <br /> Total Emissions(pounds) 25.26 13.37 <br /> Daily Average Emissions(pounds/day) 0.72 0.38 <br /> Emission factor for material handling(truck loading/unloading): <br /> Variable Reference Symbol Value Unit � �13 <br /> PM�o particle size multiplier EPA AP-42 Table 13.2.4-1 k 0.35 -- U <br /> PM2.5 particle size multiplier EPA AP-42 Table 13.2.4-1 k 0.053 -- Ef=kx0.0032x 5 <br /> Mean wind speed CaIEEMod 2011.1.1 default U 4.92 miles/hr rM '4 <br /> Moisture content(cover) EPA AP-42 Table 13.2.4-1 M 12 % I 2 J <br /> Material Handling PM�o: 8.93E-05 Ib/ton � <br /> PM2.5: 1.35E-05 Ib/to n <br /> Source: U.S.Environmental Protection Agency, Compilation ofAir Pollutant Emission Factors (AP-42),Section 13.2.4 Aggregate <br /> Handling And Storage Piles, Equation 1. Conversion factors to convert CaIEEMod wind speed of 2.2 m/s to mph: <br /> 1,609.3 meters/mile <br /> 60 seconds/minute <br /> 60 minutes/hour <br /> Page 3 Date: 7/30/2012 <br />