My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-03-11
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-03-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2013 4:28:35 PM
Creation date
3/7/2013 4:37:19 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
3/11/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
921
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Prop 7.A. - Pag@ �99 edwood City GDF Expansion <br /> Air G�uau�yi�.w i ia�c���a��y�h��alysis <br /> Appendix C: Modeling Assessment Updates <br /> Table C-3. Cumulative Health Risk Screening Analysis for Costco Wholesale Redwood City GDF. <br /> Commission,the Draft EIS/EIR is expected to be released in Spring 2012 with the final EIS/EIR released by the end of 2012[Capital <br /> Projects Program-Project Fact Sheet: Dumbarton Rail Corridor, February 2012,available at http://www.alamedactc.org/ <br /> app_pages/view/4681 (accessed March 22,2012)]. <br /> 8. California High Speed Rail passenger service is proposed to be electrically powered within the Caltrain rail corridor. Therefore, <br /> emissions of diesel particulate exhaust are not expected from this service. <br /> 9. Based on review of the City of Redwood City's Current Projects list,there are no additional approved or proposed projects within the <br /> city that would emit TACs within 1,000 feet of the project. The City of Redwood City's Current Projects list is available at pubgis. <br /> redwoodcity.org/gis/CityProjectsLaunch.aspx(accessed July 27,2012). The proposed GDF expansion is located in the southwest <br /> corner of Parcel No.053-390-020(APN). <br /> 10. The County of San Mateo approved the North Fair Oaks Community Plan Update on November 15,2011. The Plan changes the land <br /> use designation for one parcel(warehouse/office use)located within 1,000 feet of the Costco Redwood City GDF from General <br /> Industrial to Commercial Mixed Use(industrial uses requiring discretionary approval of a Conditional Use Permit by the County.) No <br /> specific projects are identified in the Community Plan or evaluated in the EIR for the Plan. As indicated in the EIR,potential new <br /> stationary sources of TACs would be subject to regulation and evaluation by the Bay Area AQMD. Source: County of San Mateo, <br /> Draft Environmental Impact Report for Proposed North Fair Oaks Community Plan Update,August 2011,Section 5.3.1 (Air Quality: <br /> Impacts and Mitigation Measures),available at www.co.sanmateo.ca.us/portal/site/planning(Pending Projects/EIR)(accessed January <br /> 23,2012). <br /> 11. Source for Bay Area AQMD significance thresholds: Bay Area Air Quality Management District,California Environmental <br /> QualityActAirQualityGuidelines,May 2011,Section 5.3(Local Community Risk and Hazard Impacts: Cumulative Impacts). <br /> 12. Since funding commitments are not yet in place to allow electrification of the Caltrain system to proceed,the Cumulative Health Risk <br /> Screening Analysis does not reflect Caltrain electrification. The estimated reduction in cumulative health risks associated with <br /> Caltrain electrification in 2025(based on information presented in Table C-4)therefore is presented separately. <br /> Page 5 Date: 7/30/2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.