Laserfiche WebLink
HC 7.A. - Page 283 ;rsection Capacity Analysis <br /> 6: Middlefield Rd & Woodside Rd 6/19/2012 <br /> � � � � � � � � � � i � <br /> Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br /> Lane Configurations � �"� � �'� � � �� � �� �"� <br /> Volume(vph) 110 340 85 510 370 345 105 1170 515 355 1165 85 <br /> Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 <br /> Total Lost time(s) 3.5 3.5 4.0 4.0 4.0 3.5 5.5 5.5 3.5 5.5 <br /> Lane Util. Factor 0.91 0.91 0.91 0.91 1.00 1.00 0.95 1.00 0.97 0.95 <br /> Frpb,ped/bikes 1.00 1.00 1.00 1.00 0.98 1.00 1.00 1.00 1.00 1.00 <br /> Flpb,ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br /> Frt 1.00 0.97 1.00 1.00 0.85 1.00 1.00 0.85 1.00 0.99 <br /> Flt Protected 0.95 1.00 0.95 0.98 1.00 0.95 1.00 1.00 0.95 1.00 <br /> Satd. Flow(prot) 1610 3274 1610 3327 1555 1770 3539 1583 3433 3503 <br /> Flt Permitted 0.95 1.00 0.95 0.98 1.00 0.95 1.00 1.00 0.95 1.00 <br /> Satd. Flow(perm) 1610 3274 1610 3327 1555 1770 3539 1583 3433 3503 <br /> Peak-hourfactor, PHF 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 <br /> Adj. Flow(vph) 115 354 89 531 385 359 109 1219 536 370 1214 89 <br /> RTOR Reduction(vph) 0 11 0 0 0 108 0 0 137 0 3 0 <br /> Lane Group Flow(vph) 103 444 0 297 619 251 109 1219 399 370 1300 0 <br /> Confl. Peds.(#/hr) 4 3 3 4 <br /> Turn Type Split Split Perm Prot Perm Prot <br /> Protected Phases 3 3 4 4 5 2 1 6 <br /> Permitted Phases 4 2 <br /> Actuated Green,G(s) 22.0 22.0 34.3 34.3 34.3 13.8 78.0 78.0 22.9 87.1 <br /> Effective Green,g (s) 22.0 22.0 34.3 34.3 34.3 13.8 78.0 78.0 22.9 87.1 <br /> Actuated g/C Ratio 0.13 0.13 0.20 0.20 0.20 0.08 0.45 0.45 0.13 0.50 <br /> Clearance Time(s) 3.5 3.5 4.0 4.0 4.0 3.5 5.5 5.5 3.5 5.5 <br /> Vehicle Extension(s) 2.0 2.0 2.0 2.0 2.0 2.0 3.0 3.0 2.0 3.0 <br /> Lane Grp Cap(vph) 204 415 318 657 307 141 1589 711 453 1757 <br /> v/s Ratio Prot 0.06 c0.14 0.18 c0.19 0.06 c0.34 c0.11 0.37 <br /> v/s Ratio Perm 0.16 0.25 <br /> v/c Ratio 0.50 1.07 0.93 0.94 0.82 0.77 0.77 0.56 0.82 0.74 <br /> Uniform Delay,d1 70.8 75.8 68.6 68.7 66.7 78.4 40.2 35.2 73.4 34.3 <br /> Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br /> Incremental Delay,d2 0.7 63.8 33.1 21.7 14.8 20.9 3.6 3.2 10.4 2.8 <br /> Delay(s) 71.5 139.6 101.7 90.4 81.5 99.3 43.8 38.4 83.7 37.2 <br /> Level of Service E F F F F F D D F D <br /> Approach Delay(s) 127.0 90.5 45.5 47.5 <br /> Approach LOS F F D D <br /> Intersection Summary <br /> HCM Average Control Delay 65.3 HCM Level of Service E <br /> HCM Volume to Capacity ratio 0.86 <br /> Actuated Cycle Length(s) - 173.7 Sum of lost time(s) - 16.5 <br /> Intersection Capacity Utilization 84.3% ICU Level of Service E <br /> Analysis Period(min) 15 <br /> c Critical Lane Group <br /> 6/13/2012 2012 Saturday Midday Peak Hour Synchro 7- Report <br /> Page 3 <br />