My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt13 Pacific Electric Contracting, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2013
>
Agmt13 Under 60K
>
Agmt13 Pacific Electric Contracting, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2013 10:07:54 AM
Creation date
3/11/2013 9:43:40 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Pacific Electric Contracting, Inc.
PROJECT NAME
East Bayshore Road Street Lighting Project
RMP File Number
304.5
Date
3/8/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION 02133 <br /> STORMWATER POLLUTION PREVENTION <br /> PART 1 - GENERAL <br /> 1.01 WORK INCLUDED <br /> A. Prohibit illicit discharge (non-rainwater) into the storm drain system. <br /> B. Construct any and all necessary systems to eliminate contaminants from entering the storm <br /> water system. <br /> C. Clean up and control of work site materials, spoils and debris. <br /> D. Removal of contaminants produced by the project. <br /> E. The work shall include the provision of all labor, materials, equipment and apparatus not <br /> specificaliy mentioned herein or noted on the plans, but which are incidentai and necessary to <br /> complete the work specified. <br /> 1.02 APPLICABLE PUBLICATIONS <br /> A. National Pollution Discharge Elimination system (NPDES) Permit No. CA0029921. <br /> B. California Storm Water Best Management Practice Handbooks: <br /> 1. Municipal <br /> 2. Industrial/Commercial <br /> 3. Construction Activity <br /> 1.03 QUALITY ASSURANCE <br /> A. All work performed under this contract and all contractors and their associates and/or <br /> employees are required to comply with all applicable storm water regulations and to implement <br /> Best Management Practices (BMP's) at all times. <br /> B. A plan shall be submitted for the proposed control of contaminants entering the storm water <br /> system. The plan must be approved by the Engineer prior to the commencement of work. <br /> C. All employees and subcontractors shall be trained on the storm water pollution prevention <br /> requirements contained in these specifications. <br /> D. A supply of spill clean-up materials such as rags or absorbents shall be kept readily accessible <br /> on-site. <br /> 1.04 ALLOWABLE DISCHARGES <br /> A. Under current NPDES regulations, the following discharges to the storm drainage system are <br /> permitted, as long as the discharges are not significant pollutants: <br /> 1. Diverted stream flows, springs and naturai drainage courses; <br /> 2. Rising flood waters; <br /> 3. Air conditioning condensation; <br /> 4. Domestic water line and hydrant flushing; and <br /> 5. Landscape irrigation. <br /> B. Groundwater from dewatering and foundation drains wili need additional certification that the <br /> groundwater has been tested or evaluated for the presence of pollutants subject to non- <br /> STORMWATER POLLUTION PREVENTION 02133-1 <br /> EAST BAYSHRORE ROAD STREET LIGHTING PROJECT <br />
The URL can be used to link to this page
Your browser does not support the video tag.