My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt13 Pacific Electric Contracting, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2013
>
Agmt13 Under 60K
>
Agmt13 Pacific Electric Contracting, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2013 10:07:54 AM
Creation date
3/11/2013 9:43:40 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Pacific Electric Contracting, Inc.
PROJECT NAME
East Bayshore Road Street Lighting Project
RMP File Number
304.5
Date
3/8/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ih" diameter by 12" long dowels at 24" on center into existing improvements. Install pre-molded <br /> expansion joint filler at the matching joint. <br /> B. A"cold"joint to the existing curb, gutter or sidewalk is not permitted. <br /> 3.13 DECORATIVE PAVEMENT CONSTRUCTION <br /> A. Decorative pavement for streets or roadways and decorative surfacing for median islands or <br /> other installations shall be formed and placed as a concrete slab conforming to the details <br /> therefor shown or noted on the drawings. <br /> 3.y4 FIELD QUALITY CONTROL <br /> A. Finish subgrade for concrete improvements shall be subject to approval prior to placement of <br /> forms. <br /> B. No concrete shall be placed prior to approval of forms. <br /> C. Appearance and finish of all concrete improvements constructed shall not contain "bird baths" or <br /> pond water and shall be smooth and ridge free. <br /> D. Finish grade at top of curb, flow line of gutter, and the finish cross section of concrete <br /> improvements shall conform to the design grades and cross sections. <br /> E. Variation of concrete improvements from design grade and cross section as shown or called for <br /> on the plans shall not exceed the tolerances established in Sections 73-1.05 and/or 73-1.06 of <br /> the State Standard Specifications, as applicable. <br /> 3.15 RESTORATION OF EXISTING IMPROVEMENTS <br /> A. Existing pavement or other improvements removed or damaged due to the installation of <br /> concrete improvements shall be replaced in kind. <br /> B. Existing landscaping or planting removed, damaged or disturbed due to the installation of <br /> concrete improvements shall be replaced in kind. <br /> 3.16 CLEANUP <br /> A. Surplus material and debris remaining upon completion of the work shall be segregated as to <br /> type, and transported from the job site and disposed of in a legal manner. <br /> * * * <br /> CONCRETE IMPROVEMENTS 02550-8 <br /> EAST BAYSHRORE ROAD STREET LIGHTING PROJECT <br />
The URL can be used to link to this page
Your browser does not support the video tag.