My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso13 PC 13-04 March 26 2013 Laurel Way EIR
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2013
>
Reso13 PC 13-04 March 26 2013 Laurel Way EIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2013 10:10:35 AM
Creation date
4/18/2013 9:37:54 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
3/26/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
implennented in order to reduce air po11uffint emissians durimg praject <br /> canstruction: <br /> a) Water all exposed surfacas�e.g.,parkiyatg are�s,stag�ng are�s,sail piles� <br /> graded ar�as, and unpaved access mads)at le�t twice daily. <br /> 1�� Cover all trucks hauling sai1, sand, and other Ioose materials offsite. <br /> c} Re�nove all visible mud or dirt t�ack-out onto adjacent soads usin��'� <br /> pow��acuum street sweepers at lEast once per day Dry power sweepi�►g <br /> would not be allowe�. <br /> d) Limit vehicie speeds on unpaved raads t� 15 mph. <br /> e) Cnmplexe paving ofmadways, driveways, aad sidewalks as soon as <br /> possible. Lay buildi.ng pa�ss as soon as possible afta grading ur►le�s <br /> seeding or sail bimde�s are used. <br /> � Minimize idling tirnes either by shutdng equip�nent off when not in use or <br /> reducing the maximum idling time to 5 minutes{as required by the <br /> California air toxics controt measure Ti�le I 3, Section 2485 of California <br /> Code af Regulatiox,$).�rovide cle�r signags for aonstruction workers at all <br /> access pnints. <br /> g) Maintain and properly tune all construction eqwpmen.t in accordance with <br /> manufacturer's specifications.A certified mechanic shall check all <br /> equipznent prior to operation ta det�nine ft is in proper oandition. <br /> ��,;� Post a publicly visible sigQ.wit�the telephone number aud person to <br /> oon�t a�th�Lead Agency reganding dust complaints.T"his person shall <br /> respond aad take con�ctive action within 48 hours vf anY camplaint�•The <br /> Aix District's phone nwnber sball also be visible to ensure comPliance <br /> with app�icable reg�xlations. <br /> Mitfga�on Measure Biology-15:The CC&Rs for the pxnject site shal]include <br /> provisions far the maintenance and protectiou of all�within the groject area. <br /> These provisions sha11 incl�de the protectioa of significant tree resources in the <br /> P�]ect erea both duri�g anc�afte�r aJl construcstion aciavities.The plan shall,at a <br /> minimum,iaclu��that all existing trees wi�th a trunk diameter of 12 inches or <br /> more, and all replacement trees,be inspeakkerl far hazard Potential and <br /> mai.ntenance by a cerlYfied arborist,registered consu�ting arborist,or a registered <br /> profaessional forester once evay two years. <br /> Mitigahon Measure Biolagy-1b: The applicant shall a.dd provisions wit.�in the <br /> CC&Ra fox t�e replaaement of trees,vegetatiom,a�d/or landsca�ping if said <br /> ele�nents fai]ta survive. Replacement af trees,veget$taon,or land�caping shall be <br /> in kind,bath in quality and quantity, and shall be iwstalled within 90 da.ys af the <br /> death ofthe previous vegetation. <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.