My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso13 PC 13-04 March 26 2013 Laurel Way EIR
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2013
>
Reso13 PC 13-04 March 26 2013 Laurel Way EIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2013 10:10:35 AM
Creation date
4/18/2013 9:37:54 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
3/26/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mftigation Measare flazards�: $oldering or welding��1 nat be performed <br /> within I S feet of dry grass or other natural fuels.A fire exi�nguishez�shalI bs <br /> a�vailable at the�roject site at all times v�rhen welding orperForming ot�t�r <br /> acti�itie�s tbat can generate sgarks. <br /> Mitigstion Meacure Haasrda-S: Building de�ign,private lot and common area <br /> landscaping,and maint�ance practices shail adhere ta the regulations and <br /> perfornQance standards included in the Fuel ManagGtnent P�an•Def�nsible spac� <br /> sk�all be a con�ideration wb�en designing landscape plans.Laadscape plans aha1113e <br /> r�viewed�d approved by the City. <br /> F'inding: Implementatian of Mitiga�ion 1Vlcasures Hazards-2,Hazards-3,Ha�ards-4, and <br /> Hazards-5 wou�d raduce the potential for increased risk of fire to a less-tba�- <br /> significant. <br /> Facts in Support of�nding. Mitiga�ion Measure�Tazards-2 would reQ�ire that any smalcing <br /> occur only in designated areas and away from areas where there are materials <br /> prone to combustion,reduc�ng the�hance of igution and fire.Mitigation Measure <br /> Hazards-3 req�that fire�xtinguishsrs and other fire�ighting tools wo�id be <br /> located izx ce�taia equzpmezit and v�hieles. Mi,tigatian Measure Hazards-3 vu�vuld <br /> require outfitking�quigment with spark arresters and mufflers.This measure <br /> would aid in fire response a�d fire prevention,thereby reduc�g����t. <br /> Mitigation Measure Hazatds-4 would restrict the lacstion af soldering and <br /> welding and would require that a fire e�tinguisher ta�ie availa�ale during these <br /> activiti�s,thereby reducing the risk af igaition aad ensUring a meanss of respon�e <br /> ta fire.Ivlitigs.tion Measure Hazards��+equires adh�ren.ce to the Fuel Management <br /> Plan,including management of defensible space,whiclr wauld reduce the <br /> potential for ignition and s�ead o£fires d�.ring oonstruc�ion and post- <br /> c�oastruction. <br /> Potential Impact 3,5-8 is described from page 3.6-?to page 3.6-8 of the Draft <br /> BTR,which are hereby incorporated by reference. <br /> Hvdrolo�?v and V�Vgi�r�uslitY <br /> Impact 3.'7-1 <br /> Impa�t: The proposed project has the potentiai to�sult in water ��i�•'����s� <br /> work would also includ�temparary diversion af water flow in the drainage sv�+ale, <br /> and g�ding for the raadbed,cvlvert,aad rip-rap during canstruction.The project <br /> wouid have the potcntial to substantially altcr the�istixig drain$$e Patt�n of the <br /> site or area,inclutling thro�gh the a�tezation of the course of a stre�m or river in a <br /> manne�tbat wouId result in su�at�.ntial erosion or siltati on an ar off site. <br /> Mitigal3on; Mitigation Meaanre HydroIogy-1; Priar to isst�n�of grading�rn11ts ar <br /> a.pproval af it�provement plans,tbe applicant shall.subrnat a de�tai.led Erosian <br /> ControI Plan(ECP)to the Director of Public Worlcs of R�wood City fo�re�riew <br /> and approval.The purpose of the ECP sha11 be to mxtigate erosion and <br /> 34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.