Laserfiche WebLink
Mitigatian: Mitigation Mensnre Noiae-I: The epplicant shall incarpcjrate the following <br /> conditiona in atl relatcd construction contract agre�ments to reduce construction <br /> noise impacts: <br /> • Muf�le and maintain all equipment us�on site.A11 internai combustion <br /> e�agine-driven equipment s�all be fitted with an�ers,which are in good <br /> condition, Gnod mufflers sha,ll result in nan-i�psct taols ge�erating a <br /> maximum noise level of 80 dB when m�asut�ed a�a distanoe of 50�eet. <br /> � Util�ize AquiebQ models of sir c;a�mpr�ssors and otha stationary noise <br /> sources where technalogy exists. <br /> f Lo�ate stationary noiso-ganerating equipmgnt as far as possible fram <br /> sensitive receptors whea aensitive receptors adjoin ox are near a ccrosttuction <br /> groject area. <br /> • Prohibit unnec�essary idling of internal oombustion engiaes. <br /> • Pra�ibit the use of canstzuction workers' radios within 50 feet of adjoining <br /> Properties. <br /> Mitigation Measure Noi�-2: Ca�st�uction and c�vnsstn�ction mai�ntez�ance <br /> a�Cti�victies (Yncluding gra�ding,exca�ating,�aving,home builcl�ng,and the cleaning <br /> and seTVicing of project vehicles ar e�uipment) shall be limited tA non-holiday <br /> weekdaya between 7:30 a.m. ead S:4Q p.m. <br /> Miitigat�on Measure Noi�e-3:All truak tra�'ic,inclnding tlie deli�ery af <br /> ma�enials anaUar equipmea�t to the sit�,will be limited�non hol�day weckday <br /> hours between 7:34 a.m.and 5:40 p.m. <br /> lltitigstion Measure Noise-4: The applicaat shall desigaa�e a Disturbance <br /> Coordinator for ti�e duration of applican�-implemented constcuction, and also <br /> incarparate in the CC�Rs the responsibility ofthe Property Owners'Association <br /> to d�signate a Distu�ance Coordinator far the dur�t�on of consttuction until fiill <br /> sete build out is comp�eted.The Disturbance Coordinator shall: <br /> • Receive ai►d act on complaints about oonstrudion �5����d�8 <br /> infrastruchu�e installation,road buiIding,residential canetruction,and o�ther <br /> oonsiruction activities. <br /> • Determine the cause{s) and implemen�t remedial rneasures a�n�essary to <br /> �Ileviate significant pmblems. <br /> • Clearly post the allowable cwnstivc�ion hours,his/her name, and phone <br /> number(s)on a aign at ea�h construction site. <br /> • Notify area residents af constru�tion acti�ities,schedules, �d impacts <br /> through issuance af a notiee tn all area resident� a minimum of one week <br /> prior to oommencement of oonatruction activities. This notice shall explain <br /> the praposed canstruction activities and scheduZe, and provide co�tact <br /> information for the Disturbance Conrdinatar should any resideints have <br /> questions, concerns, or complaints. In the event tY�at the construetion <br /> 42 <br />