My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso13 PC 13-04 March 26 2013 Laurel Way EIR
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2013
>
Reso13 PC 13-04 March 26 2013 Laurel Way EIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2013 10:10:35 AM
Creation date
4/18/2013 9:37:54 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
3/26/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Faci�in Suppart of i+Ynding: Mitigatian Measure Public Services and Utilities-3 would require <br /> natific�tion of outages and provision of tempora�y pawer during elecbricity <br /> outa�es of greater than 2 hours, �s disc�ssed on DraftEIR page 3.11-1Q,�►hich is <br /> hereby incorporated by r�eference.Mitigaticm Meas�ue Public S�rvices and <br /> Utilities-4 would require coundinating with local so�id waste callection s�rvices. <br /> Mitigation M�asure Pu6lic Senrices and Utilities-5 wauld require Utilization of <br /> water conservatinn teGhniques to reduce unpacts to wa��r supp�y.Poten6al Impact <br /> 3.11-5 is disc�ssed on Draft EIR pages 3.11-10 and 3.1�-1 l,as well as on <br /> Revissd Fi�ai EIR page 4-29,which�re hereby inoorporated by referenoe. <br /> TRANSPORTATION AND TRAFFIC <br /> Impact 3.12-1 <br /> Impact: TE�e pz�oject has the potential to rause an increase in traffic th�t is snbstaatial in <br /> re�ation ta the exisfiing traffic load and ca�acity of the strcet syst�m. <br /> Mitigation: Mitigation Meaaute Tra�o-Y: The applicants shall prepare a Tra�fic <br /> Manageme�t Plan subject to the revieur and appmval ofthe City otRedwood City <br /> prior�o Phase I and II constractian acti�itie�s. The Traffic IVlanagement Flan shall <br /> include: <br /> � The preparation of a truck traffic routing p1an, <br /> � The preparation of a parking plan for on-sibe ve�aicles and/oz carpool <br /> reqairements�`or on-si��mmployees, <br /> � The prepffi ation of a staging plan detailing appropriate locations for <br /> earthwork aotivities, oonstruction ec�uipment,and delivery ttvcks and <br /> materials,including detai�s to minimize truck trips, <br /> • �+Ieasures ta miniumize constru�tion spoils whenever pos�ble, <br /> �� �Vieasures to balance cut and fill to the greatest eactent feasible, <br /> • Measures to limit or stagger truck�affic to avoid congestion along the <br /> p�rivate portion o�Latur�l yYay, <br /> * Measures to provide su�cisnt access for ernergency vehicles to the <br /> great�st extent fe�sihl�fhrougl�out proj�oonstruction, <br /> • Preparation af a plaa for reh�bi�itating roadways that might experience <br /> �avement tiamage due to the caustzuctioa tra�'ic. <br /> M3tigation Measure Traffie 2: Canstructitin traffic shall�e pmhibited an <br /> weekencls and ho�idays and shalt be restricted to the hou�s of 7:30 AIVI—5:40 <br /> PM on wsekdays. <br /> Mitig�tion Meaaure Trsff�c-3: Prior to project constructian,the�pplicant's <br /> engineer shall perfoz�Trai�'ic Index{TI} caIcu�ations to ident�fy the current <br /> con�itians�n Hightand Av�ue and the conditions during the constructinn <br /> process. These r�alculatians s]�all be submitted to t�e Ci�y staff to establish the <br /> potentiaZ for pavement degrada�ion{and possible r�imbursem�nt}related to <br /> the project's canstruc�ion. <br /> 47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.