My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-05-06
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-05-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2013 9:53:40 AM
Creation date
5/2/2013 4:20:00 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
5/6/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.A. - Page 56 <br /> 7. Prior ta the issuance of a Building Perrnit, the app�icant shali secure an <br /> Architectura� Permit per Article A5 of the Redwood �ity Zoning 4rdir�ance. <br /> 8. The applican� sltall submif a d�tailed Eancfscape p(an in acco�rdance with <br /> the Pete's Harhor Residentiai Cammunity Pfan, #he City's landsca�ing and <br /> wat�r conservation requirements ar�d gui�eli�es. <br /> Engineering Condific�ns <br /> 9. Applicant shalf confribute its fair share or cans#ruct improvemen� per the <br /> East ��1 Infrastructures Fair Sf�are Plan. The City has an Infrastructure <br /> Plan for any development East �01, wh�ch es��lisnes fair s�are mitigat�on <br /> far �ublic improvements in the project vicinity incfudi�g roadway <br /> im�rovements, water and sew�r [ine upgrad�, etc. The applicant wo�id be <br /> requir�d to con�ribute to this program based on tfi�e num#�er of equivalent <br /> � dwelling unifs estabiished in fhe project. <br /> �0. Projec� m�sf ineet fire flow requir�ments as established by the Fire <br /> Departmer�� which are based on the ln�emational Fire Code and fihe <br /> California Fire C�de. Fire flow tests are fypicafly perforrned during the <br /> prelimi�ary design phase �ut must be campteted prior ta s�bmiF�a! af final <br /> design. Applican# shalE eontact the Fire Departmer�f for #ire �iow <br /> requirements, and ther� submit a written fire flow test requ�st to <br /> �ngineering. <br /> 11. Applicant shali b� responsib[e far the instalEation on the west sitte of <br /> Highway �09 of ar�y water line corinectior�s necessary to meet the <br /> project's fire#low rec{uirements. <br /> 12. Grading sfiall be. per�ormed in accordanc� wit� Vo[ume II�, Parfi I! a#the <br /> Ct�y's �ngineering Standards (www.redwoorfci .o cds en ir�eer3n s#andards <br /> desi�n/Partv). Sail or other consfructio� mat�riafs shall not be sto�kpiled in <br /> the p�blic right-of way, Applicant shaif subrnit cu�lfill volumes (CY} for alI <br /> , soils to be imported to or exparted ftom the site. . <br /> 13. Applicant s�rall apply for and obtairr a Grad'mg Permi�, Prior to Grading <br /> Permit issuance, the applicant sha11 submit a Plat and Finished G�'adi�g <br /> Plan prepared 6y a California registered Civi! Engin�er, <br /> 14, AIf �atilitiies shall be designed ir� accordance with the City's En�inee�ing <br /> S#andards. Afl orzsi�e private util�ties sha�l a(so be designecf fo meet Cify's <br /> E�gineering Standards or in accard�nce to City's design practice. <br /> 15. A�plicant shall e�aluate and determine #he project's imp�ct to tF�e City's <br /> wast�water system. Appficant shal[ irnprnve s�wer rrzaEns that are under <br /> capacity, based on the City's Sewer Master Pian, and are impacfed by�he <br /> project. <br /> ATlY/RE50.2795/PC PE1'ES FEAFiBOR PROJECt <br /> REV;10-25-22 VR <br /> • Page b of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.