Laserfiche WebLink
7.A. - Page 58 <br /> 25. P�ans shal! be designed to meet the C3 requirements of tt�e Mu�icipaf <br /> Regional Permit (MRP) NPD�S Permit CAS 612D08. App[icant's design <br /> professior�a! shall compfete NPQES Cl�eckfists, Ai�achments R� and R2 of � <br /> the City Standards, tQ F�elp determine the minimum requirem�nts for the <br /> project site. Requirements shai! E�e conftrmed at the time af the building <br /> permit issuance. <br /> 26. AppEicant shali complete the C,ty's "NPDES Permit Comp�i�nce Checklist�, � ' <br /> and pro�ide for permanent storrnwat�r confral measures selected from the <br /> City's "Lacal Source Canfirol Measures �ist", as a�propriate. For potentiaf <br /> solutions,th� applicant may refer to "5fart at Saurce", a Manual developed <br /> by fhe �ay Area Storrnwater Management Agencies Association by <br /> (BASM NiA}. <br /> 27. If co�rstruction is not comptete by the star# of the wet season (October '( <br /> t#�rough April 34), the appficant shall implement a winteriza#ion program to <br /> minimize the potentiai for erosion ans# sedimentation, As ap�eopriate #a <br /> the site and status of construction, wint�rization re�uirements shall incfude <br /> inspecting/maintaining/cleaning ail soil erosion and sedimenfation confrols <br /> priar to, during; and immediatefy after each storm event; stabitizing <br /> disturbed so9ls through temporary or p�rmanant seedir�g, mu�ching, <br /> mat�ing, tarpir�g or other physica! means; rocking unpaved vehicle access . <br /> ta I�m�t dispersion of much onto pubfic right-af-way; anrf caveringltarping <br /> stored constr�ction materials, f[aels, and o�her chemicals. Pfans to inci�de <br /> proposed mea5ures to prevent erosion and po�f�#ed runofF from all site <br /> condi�ions sf�alf be submitted �ar ap�ro�al by CDD prior to beginntng <br /> construcfiion. As site co�ditions warranf, tf�e City Ertgineer may direct �he <br /> appficanf to implement additfonal winterizatiar� requirements. <br /> 28. Prior to Final Map approval, t1�e ownerlapplicant sF�ali enter into a <br /> � Landscape Maintenance Agreement (LMA} for a!� assigr�ed landsca�e <br /> areas in pubiic r�gE�ts of way to be maintained. Mainfenanc� items sF�al[ <br /> include planting not limited ta �rees, shrubs, flo�nrers, grass, and ali <br /> - appurtenances ir�cl�ading ir�iga#ion systems anc� pedestrian scais fg�#ing. <br /> 2�9. Prior to Final Map ap�rovaf, the ow�er/applican# shalf errfer into a <br /> Stormw�ter Tr��tm�nt Measures Maintenance Agreemenf for al! on-site <br /> stormwater tr�atment meast�r�s associated witf► the project. <br /> 3Q. The ownerlappltcant shall pay a Traifc Mi#igation Fes based on th� . <br /> schedule s�t by Drdinance. <br /> ATTY/RESb.2795/pC P�5 HARBOR PROJECT <br /> � REV:SO-25d2 VFi <br /> Page 7 of 15 <br />