My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2013-065243
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Stormwater Treatment Measure Agreements
>
RecDoc 2013-065243
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2013 1:50:45 PM
Creation date
5/10/2013 1:42:50 PM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
StormwaterTreatment Measures Maintenance Agreement
Doc Num
2013-065243
Rec Date
4/30/2013
APN
053-173-040,050,060,070,210,120,130,190,160, 110,
Parties
Elan Redwood City, LLC
Reso Ref
PC 12-21
MO Ref
13-067
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FloGard Perk Filter <br /> Maintenance Plan for ELAN-Redwood City <br /> January 18, 2013 <br /> Project Address & Cross Streets:145 Monroe St Redwood Citv. CA <br /> Bounded bv Franklin St and Wilson St <br /> Assessor's Parcel No.: APN's 053-173-04 05 06 07, 11, 12, 13. 16, 19, and 21 <br /> Property Owner: Elan-Redwood Citv LLC. <br /> Phone No.: �415)293-8246 <br /> Designated Contact: Ali Warner <br /> Mailing Address: One Market-Spear Tower 35th & 36th Floor San Francisco, CA 94105 <br /> The property contains three (2) treatment structures, located as described below and as shown in <br /> the attached site plan: <br /> ■ Flo-Gard Perk Filter#1 is located on the proposed Access Drive at the north east portion <br /> of the project. <br /> ■ Flo-Gard Perk Filter#2 is located in the sidewalk on Franklin Street. <br /> I. Routine Maintenance Activities <br /> Table 1 shows the routine maintenance activities, and the frequency at which they will be conducted. <br /> In addition, <br /> Table 1 <br /> Routine Maintenance Activities for FloGard Perk Filter <br /> No. Maintenance Task Frequency of Task <br /> 1 Remove accumulated sediment,litter and debris from FloGard Perk Filter Before wet season and as <br /> and dispose of properly. Confirm that no clogging will occur and that the necessary <br /> structure will drain per design standards. <br /> 2 Inspect FloGard Perk Filter to ensure that there are no clogs. Test with Monthly during the wet season, <br /> garden hose to confirm that the filter will drain per design standards. and as needed after storm <br /> events <br /> 3 Inspect overflow pipe to ensure that it will safely convey excess flows to Before the wet season,and as <br /> storm drain. Repair or replace any damaged or disconnected piping. necessary <br /> 4 Inspect FloGard Perk Filter to ensure that box is structurally sound(no Annually <br /> cracks or leaks). Repair as necessary. <br /> 5 Inspect FloGard Perk Filter using the attached inspection checklist for Level Per manufacturer's <br /> 1, Level 2 and Level 3 inspections(see attached FloGard Perk Filter recommendations(attached) <br /> Systems Operations and Maintenance Manual) <br /> Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.