Laserfiche WebLink
FloGard Perk Filter <br /> Inspection and Maintenance Checklist <br /> Property Address: 145 Monroe Street. Redwood Citv Property Owner: Elan-Redwood City. LLC <br /> FloGard Perk Filter#: Date of Inspection: Type of Inspection: ❑ Level 1 ❑ Level 3 <br /> ❑ Level 2 ❑ Other <br /> I nspector(s): <br /> Defect Conditions When Maintenance Is Maintenance COmmentS(Describe maintenance Results Expected When <br /> Needed Needed?(Y/N) completed and if needed maintenance was MaintenanCe Is Performed <br /> not conducted,note when it will be done) <br /> 1. Sediment, Trash Sediment, trash and debris , Sediment,trash and debris removed <br /> and Debris accumulated in the Treatment from Treatment Structure and <br /> Accumulation Structure. Treatment Structure does disposed of properly. Treatment <br /> not drain as specified. Structure drains within 3-4 hours. <br /> 2. Clogs Soil too deep or too shallow.Sediment, Treatment Strueture drains per <br /> trash and debris accumulated in the design specifications. <br /> Treatment Structure. Treatment _ <br /> Structure does not drain within five <br /> days after rainfall. <br /> 3.Overflow Pipe Does not safely convey excess flows to Overflow pipe conveys excess flow <br /> storm drain. Piping damaged or to storm drain efficiently. <br /> disconnected. <br /> 4. Structural Treatment Structure is cracked, leaking Cracks and leaks are repaired and <br /> Soundness or falling apart. Treatment Structure is structurally <br /> sound. <br /> 5. Filter Cartridges Any visible damage to cartridge; Meet the design specifications; <br /> blockage due to debris or maintain design treatment flow rate: <br /> sedimentation. 1.5 gpm/sf of filter surface area. <br /> 6. Miscellaneous Any condition not covered above that Meet the design specifications. <br /> needs attention in order for the <br /> Treatment Structure to function as <br /> designed. <br /> Treatment Structure Maintenance Plan - Page 3 <br />