My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2013-065243
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Stormwater Treatment Measure Agreements
>
RecDoc 2013-065243
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2013 1:50:45 PM
Creation date
5/10/2013 1:42:50 PM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
StormwaterTreatment Measures Maintenance Agreement
Doc Num
2013-065243
Rec Date
4/30/2013
APN
053-173-040,050,060,070,210,120,130,190,160, 110,
Parties
Elan Redwood City, LLC
Reso Ref
PC 12-21
MO Ref
13-067
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FloGard Perk Filter <br /> Inspection and Maintenance Checklist <br /> Property Address: 145 Monroe Street. Redwood Citv Property Owner: Elan-Redwood City. LLC <br /> FloGard Perk Filter#: Date of Inspection: Type of Inspection: ❑ Level 1 ❑ Level 3 <br /> ❑ Level 2 ❑ Other <br /> I nspector(s): <br /> Defect Conditions When Maintenance Is Maintenance COmmentS(Describe maintenance Results Expected When <br /> Needed Needed?(Y/N) completed and if needed maintenance was MaintenanCe Is Performed <br /> not conducted,note when it will be done) <br /> 1. Sediment, Trash Sediment, trash and debris , Sediment,trash and debris removed <br /> and Debris accumulated in the Treatment from Treatment Structure and <br /> Accumulation Structure. Treatment Structure does disposed of properly. Treatment <br /> not drain as specified. Structure drains within 3-4 hours. <br /> 2. Clogs Soil too deep or too shallow.Sediment, Treatment Strueture drains per <br /> trash and debris accumulated in the design specifications. <br /> Treatment Structure. Treatment _ <br /> Structure does not drain within five <br /> days after rainfall. <br /> 3.Overflow Pipe Does not safely convey excess flows to Overflow pipe conveys excess flow <br /> storm drain. Piping damaged or to storm drain efficiently. <br /> disconnected. <br /> 4. Structural Treatment Structure is cracked, leaking Cracks and leaks are repaired and <br /> Soundness or falling apart. Treatment Structure is structurally <br /> sound. <br /> 5. Filter Cartridges Any visible damage to cartridge; Meet the design specifications; <br /> blockage due to debris or maintain design treatment flow rate: <br /> sedimentation. 1.5 gpm/sf of filter surface area. <br /> 6. Miscellaneous Any condition not covered above that Meet the design specifications. <br /> needs attention in order for the <br /> Treatment Structure to function as <br /> designed. <br /> Treatment Structure Maintenance Plan - Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.