My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2013-065243
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Stormwater Treatment Measure Agreements
>
RecDoc 2013-065243
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2013 1:50:45 PM
Creation date
5/10/2013 1:42:50 PM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
StormwaterTreatment Measures Maintenance Agreement
Doc Num
2013-065243
Rec Date
4/30/2013
APN
053-173-040,050,060,070,210,120,130,190,160, 110,
Parties
Elan Redwood City, LLC
Reso Ref
PC 12-21
MO Ref
13-067
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i t <br /> 4 � P a g e - FloGard� Perk Filter System O& M Manual <br /> __ _ _ _ _. . __ _ _. . _ _ <br /> 3. A Level 2 inspection service shall consist of a physical,confined-space entry into the cartridge <br /> bay. The filter cartridges and filter media shall be inspected for condition and filter media life,the <br /> sediment level, if any, measured, and any trash or debris removed and disposed of in accordance <br /> with local regulations. All information and recommendations shall be noted on the maintenance <br /> record. <br /> 4. A Level 3 service shall consist of a physical, confined-space entry into the cartridge bay. The filter <br /> cartridges shall be removed and replaced with re-charged exchange filter cartridges. As an <br /> option, the filter media may be removed of on-site, the cartridges cleaned, and replacement <br /> media be installed into the cartridges. All spent filter media shall be disposed of in accordance <br /> with local regulations. <br /> 5. Upon completion of inspection/service, re-install the manhole access cover(s). <br /> 6. The manhole cover(s) and/or grate(s) shall be replaced. <br /> Inspection/Maintenance Requirements <br /> Listed below are some recommendations for equipment and training for personnel to inspect and <br /> maintain a FloGardO Perk Filter system. <br /> Personnel— OSHA Confined Space Entry Training is a prerequisite for entrance into a <br /> system. In the state of California personnel should be CaIOSHA certified. <br /> Equipment— Record Taking (pen, paper, voice recorder) <br /> Proper Clothing (appropriate footwear,gloves, hardhat, safety glasses, etc.) <br /> Flashlight <br /> Tape Measure <br /> Measuring Stick <br /> Pry Bar <br /> Traffic Control (Flagging, barricades, signage, cones, etc.) <br /> First aid materials <br /> Debris and Contaminant collectors <br /> Debris and Contaminant containers <br /> Vacuum Truck <br /> Disposal of Gross Pollutants, Hydrocarbons, Sediment,and Filter Media <br /> The collected gross pollutants, hydrocarbons, sediment, and filter media shall be disposed of in <br /> accordance with local, state and/or federal agency requirements. <br /> KriStar Enterprises,Inc. <br /> 360 Sutton Place <br /> Santa Rosa,CA 95407 <br /> (800)579-8819 <br /> www.kristar.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.