My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-05-20 Closed Cancelled and Special
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-05-20 Closed Cancelled and Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2013 3:32:59 PM
Creation date
5/16/2013 3:56:45 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Public Finance Authority
Date
5/20/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.D. - Page 20 <br /> RECORDING REQUESTED BY � <br /> AND WHEN RECORDED MAIL TO: � <br /> � <br /> City of Redwood City � <br /> 1017 Middlefield Road � <br /> Redwood City, California 94063 � <br /> Attention: City Clerk � <br /> ) <br /> ) <br /> (Space Above This Line for Recorder's Use Only) <br /> Exempt from recording fee per Gov.Code§27383. <br /> LANDSCAPE MAINTENANCE AGREEMENT <br /> One Marina—Bair Island Road Phase 2 <br /> THIS LANDSCAPE MAINTENANCE AGREEMENT ("Agreement") is made and entered into <br /> this day of , 20_ ("Effective Date"), by and between RC Peninsula Park, LLC, a <br /> Delaware limited liability partner("Developer"), and the CITY OF REDWOOD CITY, a charter city and <br /> California municipal corporation("City")with reference to the following facts: <br /> RECITALS <br /> A. Reference is made to that certain real property situated in the City of Redwood City, <br /> County of San Mateo, State of California, known as the One Marina site and described on Exhibit "A", <br /> attached hereto and incorporated by this reference as if fully set forth herein (the "Property"). The <br /> Property is being developed as a condominium project. The Developer expects to transfer its interest in <br /> the Properiy to the One Marina Owner's Association ("HOA"), a California nonprofit mutual benefit <br /> corporation, which HOA shall be ultimately responsible for the management, operation and governance <br /> of the Property. <br /> B. In connection with its development of the Property as a residential community, the <br /> Developer submitted to the City a Precise Plan, PC Permit, and Construction Documents, which include, <br /> inter alia, landscaping plans for reconstructed Bair Island Road along the Property frontage ("Plans"), all <br /> of which Plans have been approved by the City. The Plans provide for installation of certain landscaping, <br /> pedestrian lighting, irrigation piping and controller, pedestrian path, and bicycle path ("Improvements") <br /> within that portion of the City owned right of way and easement area beginning at the back of the south <br /> Bair Island Road curb and extending south from there to the south side of the pedestrian path/sidewalk <br /> along the entire One Marina site frontage along Bair Island Road ("Maintenance Area") as the <br /> Improvements and Maintenance Area are more specifically shown on Exhibit"B" attached hereto and by <br /> this reference made a part hereof. <br /> C. Reference is made to the Landscape Maintenance Agreement for the Phase 1 Bair Island <br /> Road improvements,recorded in the Official Records of the County of San Mateo as document no. 2011- <br /> 115422. <br /> D. The Developer previously submitted a final map for the Property, which has been <br /> reviewed by the City Engineer and was approved concurrently with the Agreement described in Recital C. <br /> ("Final Map"). <br /> ATTY/AGR/2013.048/LANDSCAPE MAINTENANCE AGREEMENT-ONE MARINA-BAIR ISLAND RD PHASE 2 <br /> REV:04-02-13 VR <br /> Page 1 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.