Laserfiche WebLink
MM GEO 1-l: Excavation and grading work will be scheduled in dry weather months to the <br /> extent feasible,to prevent excess erosion runoff into the creek. Excavation <br /> and grading work that is scheduled in wet weather months will be <br /> weatherized14 to withstand or avoid erosion throughout the project <br /> construction. Weatherization measures would consistent with RWQCB Best <br /> Management Practices used to reduce construction-related water quality <br /> impacts (see Section 4.93.4) <br /> MM GEO 1-2: Stockpiles and excavated soils will be covered with secured tarps or plastic <br /> sheeting. <br /> 4.6.3 Conclusion <br /> Implementation of the proposed mitigation measures would reduce erosion impacts during <br /> construction to a less than significant level. With implementation of recommendations in the design- <br /> specific geotechnical report and conformance with the 2010 Building Code,the project would not <br /> expose people or property to significant impacts associated with geologic or seismic conditions. <br /> (Less Than Significant Impact with Mitigation) <br /> 14 Weatherized refers to measures that would protect exposed soils from rain and stormwater runoff. <br /> Kensington Assisted Living Facility Project 39 Initial Study <br /> Redwood City Apri12013 <br />