Laserfiche WebLink
Frank R. Poss, IV, REA <br /> Department Manager <br /> Education <br /> MS in Geology, Emphasis in Hydrogeology, San Diego State University, thesis pending <br /> BA in Geology, Emphasis in Geochemistry,University of California, Santa Barbara, 1983 <br /> Certifications/Registrations/Technical Training <br /> Environmental Professional—Phase I ESA -PSI, Phase II ESA PSI, Project Management-PSI <br /> Registered Environmental Assessor, #REA05522, California <br /> AHERA Asbestos Building Inspector—#28719 I <br /> PSI IAQ/Mold Inspector <br /> Professional Experience <br /> Mr. Poss has over 25 years experience in the management of environmental site assessments, groundwater <br /> and soil remediation projects, hazardous waste management, and subsurface investigation programs. His <br /> experience includes supervision ofproject and staff level personnel, as well as subcontractors,implementation <br /> of QA/QC programs and Health and Safety Programs, contractual negotiations, and budgetary management of <br /> projects ranging from $20,000 to over $1,000,000. He serves as the lead modeler for projects should these <br /> services is required. He has been using numerical models for two and three-dimensional flow and <br /> contaminate transport since 1988. He has utilized models to simulate existing flow conditions and to evaluate <br /> effectiveness of various groundwater remediation programs. He was the project manager for over $500,000 <br /> of work for the Na�y, including projects that involved underground storage tank testing projects, wetlands <br /> studies, remedial investigation, data management, underground storage tank surveys, underground storage <br /> tank removals and landfill assessments. The projects included work throughout the State of California. <br /> Representative Phase I/II Environmental Site Assessment Project Experience <br /> • McDonalds; San Jose, California-Project manager for over 50 Phase I/II ESA projects associated with <br /> future McDonalds restaurants. Typical Phase I ESA projects included completing site walk-through, <br /> aerial photograph review, data search, regulatory interviews, file review, chain-of-title search, and report <br /> preparation. Typical Phase II ESA projects included the collecting of soil samples as part of geotechnical <br /> studies at the site to verify that site remediation had been completed. <br /> • Bank of America; San Francisco, California-Project manager for over 200 Phase I ESA projects. Site <br /> investigation included apartment buildings, strip malls, light industrial, and commercial properties. The <br /> Phase I ESAs was typically completed within three weeks of authorization and was completed according <br /> to standard protocol. <br /> • Fidelity Federal Bank; Northern California-Project manager for Phase I ESAs for scheduled property <br /> acquisition/development. Also provided consultation services as a third-party reviewer for work <br /> performed by other consultants for the client. Completed environmental assessments on 64 properties <br /> throughout the State of California, including Sacramento and Citrus Heights, within three weeks of <br /> authorization. The environmental assessments were completed according to standard protocol and <br /> included regulatory record review, site reconnaissance, aerial photograph interpretation, and report <br /> preparation. <br /> • Citigroup, California-Project manager for over 100 Phase I ESAs for Citigroup branch and office <br /> buildings. The work performed included the completion of a comprehensive asbestos survey of two of <br /> the buildings, historical records research, and interviews with on-site personnel, and aerial photograph <br /> review. <br /> File Name: FPoss(If) <br /> Revised: 12/2/04 <br />