My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso13 PC 13-09 2859 Initial Study Mitigated Negative Declaration Kensington
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2013
>
Reso13 PC 13-09 2859 Initial Study Mitigated Negative Declaration Kensington
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2013 4:26:34 PM
Creation date
5/28/2013 9:28:11 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
5/21/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
565
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HCM Signalized Intersection Capacity Analysis School Existing+Project <br /> 1: Oakwood Drive & EI Camino Real 3/2/2012 <br /> � � �# � � � fl � I � � � <br /> ,,,����������������������������,,,;���� ' �f�,,,,,,��`��'; ,,���i°;;,,���;' '���;'����f��';����,' ��;,','���',, ;�����;' % <br /> Lane Configurations � � � ��'� � <br /> Volume(vph) 48 20 56 87 16 53 31 71 1533 32 54 76 <br /> Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 <br /> Total Lost time(s) 4.0 4.0 4.0 4.0 4.0 <br /> Lane Util. Factor 1.00 1.00 1.00 0.91 1.00 <br /> Frpb,ped/bikes 0.99 0.99 1.00 1.00 1.00 <br /> Flpb,ped/bikes 1.00 0.99 1.00 1.00 1.00 <br /> Frt 0.94 0.95 1.00 1.00 1.00 <br /> Flt Protected 0.98 0.97 0.95 1.00 0.95 <br /> Satd. Flow(prot) 1691 1707 1770 5070 1770 <br /> Flt Permitted 0.82 0.71 0.95 1.00 0.95 <br /> Satd. Flow(perm) 1418 1245 1770 5070 1770 <br /> Peak-hourfactor, PHF 0.81 0.81 0.81 0.89 0.89 0.89 0.92 0.92 0.92 0.92 0.92 0.92 <br /> Adj. Flow(vph) 59 25 69 98 18 60 34 77 1666 35 59 83 <br /> RTOR Reduction(vph) 0 33 0 0 21 0 0 0 2 0 0 0 <br /> Lane Group Flow(vph) 0 120 0 0 155 0 0 111 1699 0 0 142 <br /> Confl. Peds.(#/hr) 7 10 10 7 <br /> Turn Type Perm Perm Prot Prot Prot Prot <br /> Protected Phases 4 8 5 5 2 1 1 <br /> Permitted Phases 4 8 <br /> Actuated Green,G(s) 14.5 14.5 8.6 38.1 11.7 <br /> Effective Green,g(s) 14.5 14.5 8.6 38.1 11.7 <br /> Actuated g/C Ratio 0.19 0.19 0.11 0.50 0.15 <br /> Clearance Time(s) 4.0 4.0 4.0 4.0 4.0 <br /> Vehicle Extension(s) 3.0 3.0 3.0 3.0 3.0 <br /> Lane Grp Cap(vph) 269 237 200 2532 271 <br /> v/s Ratio Prot 0.06 c0.34 c0.08 <br /> v/s Ratio Perm 0.08 c0.12 <br /> v/c Ratio 0.45 0.65 0.56 0.67 0.52 <br /> Uniform Delay,d1 27.3 28.6 32.0 14.4 29.7 <br /> Progression Factor 1.00 1.00 1.00 1.00 1.00 <br /> Incremental Delay,d2 1.2 6.3 3.3 0.7 1.8 <br /> Delay(s) 28.5 34.9 35.4 15.1 31.6 <br /> Level of Service C C D B C <br /> Approach Delay(s) 28.5 34.9 16.3 <br /> Approach LOS C C B <br /> ��,,,�,,,,,,�,���,�„�,,,°'%�///%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%/ <br /> HCM Average Control Delay 16.4 HCM Level of Service B <br /> HCM Volume to Capacity ratio 0.67 <br /> Actuated Cycle Length(s) 76.3 Sum of lost time(s) 16.0 <br /> Intersection Capacity Utilization 61.4% ICU Level of Service B <br /> Analysis Period(min) 15 <br /> c Critical Lane Group <br /> TJKM Synchro 7- Report <br /> Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.