My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-06-03 Closed and Joint
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-06-03 Closed and Joint
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2013 5:17:27 PM
Creation date
5/30/2013 3:20:42 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
6/3/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.C. - Page 9 <br /> Night Work <br /> If flow and/or traffic are an issue for CONTRACTOR to complete a segment, arrangements will be made <br /> with City to work at night. CONTRACTOR shall provide businesses/residences 48 hours prior notice of <br /> any potentially disruptive activity. <br /> Submittals <br /> After the project is complete, CONTRACTOR shall provide the City with an external hard drive containing <br /> the videos, jpegs, and inspection reports. This hard drive shall become property of the City of Redwood <br /> City. <br /> DEADLINE: <br /> CONTRACTOR shall complete all work within 60 (sixty) Calendar days of the City's notice to proceed. <br /> CONTRACTOR shall put a third crew on this project if needed. CONTRACTOR shall average about <br /> 3,000 linear feet per day, per crew, which shall allow CONTRACTOR to finish within the City's timeframe. <br /> CONTRACTOR shall provide the City with a detailed work schedule, to include streets and dates, at <br /> City's request. <br /> PAYMENT TERMS: <br /> Fee shall include all labor, materials, and equipment necessary to clean and inspect manholes, clean and <br /> inspect sewer lines, implementing traffic control, procuring water, disposing of debris, and delivering hard <br /> drive as noted. <br /> Sanitary Sewer Sanitary Sewer Sanitary Sewer <br /> Basin No 5B Basin No 5F Basin No 5H Linear <br /> Length Length Length Foot <br /> Diameter (Linear Feet) (Linear Feet) (Linear Feet) Price <br /> 4" -- -- -- <br /> 6" 17,527 27,865 3,499 $1.93 per If <br /> 8" 12,613 14,539 13,492 $1.93 per If <br /> 10" 853 -- 115 $1.93 per If <br /> 12" 1,438 1,446 -- $1.93 per If <br /> 15" 3,595 5,717 -- $1.93 per If <br /> 16" 29 -- -- $1.93 per If <br /> 18" 378 -- -- $1.93 per If <br /> 21" -- 2,836 -- $1.93 per If <br /> 24" 407 21 -- $1.93 per If <br /> Basin No 5B —36,840.00 Linear feet <br /> 3 Man Crew with Vacuum Truck, CCTV Unit& Pickup Truck—288 man hours to complete. <br /> Basin No 5F—52,424.00 Linear feet <br /> 3 Man Crew with Vacuum Truck, CCTV Unit& Pickup Truck—408 man hours to complete. <br /> Basin No 5H— 17,106.00 Linear feet <br /> 3 Man Crew with Vacuum Truck, CCTV Unit& Pickup Truck— 144 man hours to complete <br /> *Includes 8 hours on job with traffic control setup, getting water for cleaning truck, disposal of <br /> debris, as well as clean and CCTV of sewer lines. <br /> Total Estimated Cost of Services: $205,294.10 <br /> Page 7 of 7 <br /> ATTY/AGR/2013.082/NOR-CAL PIPELINE SERVICES <br />
The URL can be used to link to this page
Your browser does not support the video tag.