My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-06-24 Closed and Joint Amended 06-21_2013
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-06-24 Closed and Joint Amended 06-21_2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2013 3:46:24 PM
Creation date
6/20/2013 5:41:05 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
6/24/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
383
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.A. - Page 16 <br /> c. Management Costs. <br /> d. Payment of Franchise Fees to the City of San Carlos. <br /> e. Such other distribution as authorized by the Board. <br /> ARTICLE 13. SBwMA ADMINISTRATION POWERS <br /> 131 Assertion of Authority. The Members shall not engage in any action that would <br /> duplicate, circumvent, by-pass, or supersede the SBWMA's powers, as expressed in this <br /> Agreement. <br /> 13.2 Facility Operator. The Members agree that the SBWMA shall have sole <br /> authority to operate or contract for the operation of the Facilities, and have sole authority to <br /> direct the delivery of all or a portion of each Member's Solid Waste, Recyclable Material, and <br /> Plant Material to the Facilities, except as provided in Exhibit D hereto. No Member shall take <br /> any action in any manner, inconsistent with the terms of this Agreement. <br /> 13.3 Operating Records. The SBWMA will cause the Facilities' Contractor to <br /> maintain accurate, timely, and complete records of operations at the Facilities, as necessary to <br /> comply with any CIWMA or other State requirements, or this Agreement. <br /> 13.4 Operations Reporting. The SBWMA shall cause the Facilities' Contractor to <br /> compile information and report on any of its Facilities operations, in accordance with the <br /> CIWMA and this Agreement. <br /> 13.5 Solid Waste Reporting. The SBWMA shall cause the Facilities' Contractor to <br /> compile and report to the CIWMA and other State of California agencies data on Solid Waste <br /> accepted at the Facilities, all on behalf of the Members. <br /> 13.6 Require Compliance with Laws. The SBWMA shall require the Facilities <br /> Contractor to operate said Facilities in compliance with all Federal, State, and local laws, <br /> Environmental Laws, guidelines, and regulations, as may exist, or as may exist from time to <br /> time. <br /> 13.7 Bond Payment Review. The SBWMA shall at least annually review the <br /> Revenue Bond payment history and payment projections to the end of bond repayment. <br /> 13.8 Bond Management. The SBWMA shall periodically consider defeasing the <br /> Revenue Bonds and refinancing any existing debt to the economic benefit of the Members, as <br /> market conditions allow. <br /> 13.9 Bond Reserves. The SBWMA shall maintain at least the minimum reserve fund <br /> requirements specified in the Revenue Bond covenants. <br /> 1310 Asset Reserves. The SBWMA shall establish and maintain an asset replacement <br /> reserve fund at a level at least adequate to finance appropriate and ordinary asset replacement at <br /> the Facilities. <br /> ATTY/AGR/2013/AMENDMENTS/AMEND N0.2 SBWMA JPA AGREEMENT <br /> REV: 06-10-13 PT <br /> Page 11 of 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.