My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt75 South Bayside System Aut - Silicon Valley Clean Water
RedwoodCity
>
City Clerk
>
Agreements
>
1970-1979
>
1975
>
Agmt75 South Bayside System Aut - Silicon Valley Clean Water
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2014 4:18:50 PM
Creation date
3/25/2004 12:12:50 PM
Metadata
Fields
Template:
Agreement
Contractor Name
South Bayside System Authority
PROJECT NAME
joint exercise of powers agreement
RMP File Number
304 bin 12
Date
11/13/1975
Reso Ref
14870
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
��S:djg-c 2/21/8� <br /> _ � ` aS:djg-c 3/05/84R <br /> ' DES:djg-c 3/12/84R <br /> � "The .provisions of �his Subdivisian (b3 of this Section <br /> 5.6 are self-executing; provided, however, that the Commission may <br /> establ�sh and implement such administrative procedures and <br /> gractices consistent herewith as it �eems necessary or <br /> appropriate to accomplish the purposes hereof. Nothing herein <br /> proviaed sha11 require the cons�ruction of any or alI 5ubstages <br /> 2-9 of Stage 2 0� the Project ar to commence construction thereof <br /> at any particular time unless sufficier�t funds therefor have been <br /> paid over to the Authority as herein provided. " <br /> 10. Section 5.8 af the Agreement �s hereby amended to read <br /> as follows: <br /> "Section 5.8. Conveyance of Facilities by_Belmont and <br /> Redwood City. Helmont and Redwood City shall �ach convey to the <br /> � Authority those portians of the Joint Facili�ies now owned by <br /> them, respectively, together with rights af access thereto, said <br /> pertions being the existing Belmont pumping station and the <br /> existing main pumping station in Redwooc3 City (excluding the land <br /> on which they are constructed) . If either such conveyance takes <br /> pl.ace prior ta the operative date of Stage 1 of the Project, the <br /> casts of maintenance and operatian of the facilities conveyed <br /> shall be aadec� to the cost of maintenance and operation of the <br /> 1969 facilities and paid for as grovicied in Section 5.3." <br /> 11. Section 5. 9 of the Agreement is hereby amended to read <br /> as follows: <br /> "Section 5.9 . Allocatian of Ca�ital Costs. <br /> � " (a) Capital Costs of Sta e 1 of the Project. The <br /> _.._.�.__�.__ <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.