My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-07-22
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-07-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2013 5:12:30 PM
Creation date
7/19/2013 3:15:07 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
7/22/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
570
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.2.A. - Page 1 <br /> RE PO RT <br /> To the Honorable Mayor and City Council <br /> From the Cit Mana er <br /> July 22, 2013 <br /> SUBJECT <br /> Final Acceptance —Redwood Creek Box Culvert Relocation Project (Middlefield Road, <br /> between Jefferson and Hamilton) <br /> RECOMMENDATION <br /> By motion, accept the Redwood Creek Box Culvert Relocation Project and authorize the <br /> release of bonds and retention according to city procedures <br /> BACKGROUND <br /> On September 10, 2012, Council awarded the construction contract for the <br /> Redwood Creek Box Culvert Relocation Project to McGuire and Hester. This project <br /> consisted generally of constructing 426 linear feet of storm drain box culvert with <br /> associated roadway improvements and utility relocations. <br /> Construction started in October2012 and was substantially completed May 2, <br /> 2013. Final walkthrough was conducted with City maintenance staff, project <br /> inspector, third party project manager, engineers, and contractor. Final completion <br /> was achieved May 31, 2013. . <br /> ANALYSIS <br /> The contract was awarded for a base bid of $1,995,235. The project was <br /> successfully completed in accordance with the plans and specifications. Change <br /> orders were issued totaling $63,000 and included a 25 calendar day extension due to <br /> circumstances outside the contractor's control. The final contract amount is <br /> $2,058,235 which is 3.6% more than the initially awarded contract amount. <br /> Change orders resulted from additional work required to remove and relocate existing <br /> concrete encased AT&T conduit exposed during demolition that were not as shown on <br /> the record drawings, removal of soils found to be unsuitable for disposal at standard <br /> non-hazardous waste site, and installation of a new thrust block to support and protect <br /> existing 12" waterline found to be closer to new culvert alignment than what was <br /> reflected on record drawings, and electrical work not shown on the contract documents. <br /> ALTERNATIVES <br /> Council may choose not to accept the project and/or authorize the release of bonds <br /> and retention which would be contrary to the terms of the contract, prior Council <br /> action, and the public contracting code_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.