Laserfiche WebLink
6.2.C. - Page 1 <br /> RE PO RT <br /> To the Honorable Mayor and City Council <br /> From the Cit Mana er <br /> July 22, 2013 <br /> SUBJECT <br /> Final Acceptance — EI Camino Real Storm Drain & Water Main Rehabilitation Project <br /> (Near James Avenue) <br /> RECOMMENDATION <br /> Accept, by motion, the EI Camino Real Storm Drain & Water Main Rehabilitation Project <br /> (Near James Avenue) and authorize the release of bonds and retention according to <br /> city procedures. <br /> BACKGROUND <br /> On November 19, 2012, Council awarded the construction contract for the EI Camino <br /> Real Storm Drain & Water Main Rehabilitation Project to Valentine Corp., Inc., of San <br /> Rafael. The project replaced approximately 165 linear feet of 48-inch corrugated metal <br /> (CMP) storm drain pipe with new 48-inch dual wall high density polyethylene (HDPE) <br /> storm drain pipe and rehabilitated the existing 12-inch cast iron pipe (CIP) water main <br /> by installing new 12-inch butterfly isolation valve and cathodic protection to increase the <br /> service life of the 12-inch CIP water line. <br /> Construction started on February 25, 2013 and achieved final completion on April 26, <br /> 2013. <br /> ANALYSIS <br /> The contract was awarded for a base bid of $119,950. The project was successfully <br /> completed in accordance with the plans and specifications. Change orders were issued <br /> totaling $9,766.70. The final contract amount is $129,716.70 which is 8.14% higher <br /> than the initially awarded contract amount. Change orders resulted from the following <br /> work that was not included in the contract. <br /> a. Installation of new 48-inch dual wall HPDE storm drain line by open cut method <br /> instead of sliplining method due to constructability issues and actual field conditions. <br /> b. Installation of concrete apron at the headwall to channel the water flow to the newly <br /> installed 48-inch dual wall HDPE storm drain pipe. <br /> c. Repair of an apparent sink hole in a section of the pavement along EI Camino Real <br /> that occurred in the project area after the contract was awarded. <br />