6.1.A. - Page 6 <br /> 2. Preparation or review of maximum four (4) change orders or change order cost <br /> estimate is included. <br /> 3. Two (2) site visits are included. <br /> Deliverables: <br /> 1. Review comments to Contractor submittals <br /> 2. Review of change order documents <br /> FEE SCHEDULE <br /> Compensation shall be made on a time and materials, not to exceed basis for the Project <br /> Totals as broken down in the following table. The overall effort shall not exceed the total <br /> project upper limit as shown below. Invoices shall be based on CONSULTANT's rate <br /> schedule in effect at the time services are performed. The current TJC & Associates, <br /> Inc., rate schedule appears below. <br /> Description Labor Labor Other Total <br /> Hours Budget Direct Task <br /> Costs Cost <br /> Task 1.1 — Project Management 10 $1,990 $199 $2,189 <br /> Task 4.1 — Additional Construction Services 56 $5,674 $743 $6,417 <br /> TOTAL 66 $7,664 $942 $8,606 <br /> Note: Includes CONSULTANT's 10% markup on direct costs. <br /> TJC & Associates, Inc. Current Rate Schedule <br /> Engineer <br /> Level 10 (E10) $199.00/hour <br /> Level 6 (E6) $167.00/hour <br /> Level 3 (E3) $138.00/hour <br /> Level 1 (E1) $107.00/hour <br /> FEE SCHEDULE <br /> According to Contractor's schedule, mobilization is anticipated in July of 2013 and <br /> construction is anticipated to conclude in October of 2013. <br /> ATTY/AGR/2013/AMENDMENTS/AMEND N0.1 TJCAA 8606.00 <br /> REV: 07-17-13 PT <br /> Page 4 of 4 <br />