My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-07-22
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-07-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2013 5:12:30 PM
Creation date
7/19/2013 3:15:07 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
7/22/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
570
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.A. - Page 6 <br /> 2. Preparation or review of maximum four (4) change orders or change order cost <br /> estimate is included. <br /> 3. Two (2) site visits are included. <br /> Deliverables: <br /> 1. Review comments to Contractor submittals <br /> 2. Review of change order documents <br /> FEE SCHEDULE <br /> Compensation shall be made on a time and materials, not to exceed basis for the Project <br /> Totals as broken down in the following table. The overall effort shall not exceed the total <br /> project upper limit as shown below. Invoices shall be based on CONSULTANT's rate <br /> schedule in effect at the time services are performed. The current TJC & Associates, <br /> Inc., rate schedule appears below. <br /> Description Labor Labor Other Total <br /> Hours Budget Direct Task <br /> Costs Cost <br /> Task 1.1 — Project Management 10 $1,990 $199 $2,189 <br /> Task 4.1 — Additional Construction Services 56 $5,674 $743 $6,417 <br /> TOTAL 66 $7,664 $942 $8,606 <br /> Note: Includes CONSULTANT's 10% markup on direct costs. <br /> TJC & Associates, Inc. Current Rate Schedule <br /> Engineer <br /> Level 10 (E10) $199.00/hour <br /> Level 6 (E6) $167.00/hour <br /> Level 3 (E3) $138.00/hour <br /> Level 1 (E1) $107.00/hour <br /> FEE SCHEDULE <br /> According to Contractor's schedule, mobilization is anticipated in July of 2013 and <br /> construction is anticipated to conclude in October of 2013. <br /> ATTY/AGR/2013/AMENDMENTS/AMEND N0.1 TJCAA 8606.00 <br /> REV: 07-17-13 PT <br /> Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.