7.A. - Page 6 <br /> in the project, building the structure with this requirement ensures quality jobs in <br /> Redwood City for the contracting community. <br /> For the past several months the Developer has been pursuing its due diligence <br /> regarding the condition of the property. Based on soil samples taken throughout the <br /> property site, including the properties owned by the developer, various levels of soil <br /> contamination have been identified. Depending upon the nature of the contaminants a <br /> remediation plan may be required by other regulatory agencies. The Developer is <br /> responsible for the preparation of any such plan, as well as the implementation of that <br /> remediation. The contaminants range from hydrocarbons to dry cleaning solvents and <br /> the ultimate handling and disposition of them are still under evaluation by the contractor, <br /> the Developer, the City, and regulatory agencies. Because the contamination is an <br /> unforeseen cost, it affects the value of the land. The DDA acknowledges the impact of <br /> this cost on the offering price of $17 million, by reserving a portion of the proceeds in <br /> escrow. The DDA calls for the City to leave $3 million in escrow as its share of the <br /> potential cost of site cleanup and material disposal, thereby capping the City's exposure <br /> to cleanup costs. Exhibit K of the DDA outlines the process for accessing these funds <br /> and their allowed use. Any funds remaining in this account at the end of the project <br /> clean up will be issued to the City. Because two of the properties are already owned by <br /> the Developer, not all of the cleanup costs are associated with the City's property. <br /> Construction <br /> Development of the site is complicated because the excavation is proximate to the <br /> Caltrain right-of-way and the shoring along that edge must meet the railroad's <br /> standards. Similarly, along Winslow Street and Middlefield Road the City is concerned <br /> for the integrity of the street, so shoring along these rights-of-way is critical not only to <br /> the building but to the public infrastructure. Complicating the construction even more is <br /> a cutoff wall along Jefferson Street that was constructed as part of the undercrossing <br /> project. This cutoff wall keeps water from flowing into Jefferson Street from the abutting <br /> land. When this wall was constructed a portion of it was built onto City property, such <br /> that there is a portion not parallel to Jefferson Street. This angled section of wall will be <br /> reconstructed parallel to Jefferson Street to enable the excavation of the full site and <br /> construction of the subterranean garage. <br /> The building is designed as a steel frame structure set on a concrete parking garage <br /> base. The Developer plans for a mat-slab foundation, which is a thick concrete floor <br /> rather than a driven pile foundation. Although constructing the slab will involve several <br /> large concrete pours, affecting traffic on Middlefield and Jefferson, it will be far less <br /> disruptive than the import and driving of piles. The contractor intends to use the <br /> Winslow Lot as its staging area, routing its construction vehicles through that parcel for <br /> queuing and deliveries. <br /> ALTERNATIVES <br /> The City Council could determine not to accept the recommendations of the Planning <br /> Commission and amend the project or conditions as deemed appropriate. <br />