My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-07-22
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-07-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2013 5:12:30 PM
Creation date
7/19/2013 3:15:07 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
7/22/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
570
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.A. - Page 82 <br /> the San Mateo Countywide Stormwater Pollution Prevention Program, including <br /> a Stormwater Pollution Prevention Plan (SWPPP). (www.scrcb.ca.qov/stormwtr/ <br /> construction.html). Verification that the NOI has been submitted to the State <br /> Water Resources Control Board must be provided prior to issuance of any <br /> Building or Construction Permit. <br /> 30. Parking garage ramps shall be designed in conformance with <br /> Volume III of the Engineering Standards, and shall consider safety and visibility <br /> of pedestrians to the satisfaction of the City Engineer. <br /> 31. The applicant/contractor shall apply for a Construction <br /> Improvement Permit from Community Development Department for work in the <br /> City public right-of-way, easements, or property in which the City holds an <br /> interest prior to any construction. <br /> 32. The fire flow required is 3500 GPM with four fire hydrants required, <br /> spaced 350' apart. This includes the use of existing fire hydrants in proximity to <br /> the project. The applicant shall be responsible for their installation at locations to <br /> be determined by the City prior to issuance of a Building permit. <br /> 33. An automatic fire sprinkler systems meeting the requirements of <br /> NFPA Standard 13 is required for this Project. Two risers may be necessary due <br /> to the size of the structure. The applicant shall comply with the Fire Department <br /> requirements at all times. <br /> 34. The installation of manual wet-standpipe system, meeting the <br /> requirements of NFPA Standard 14 is required as part of this Project. <br /> 35. The installation of a firefighter communication system meeting the <br /> requirements of the Redwood City Fire Code is required as a part of this Project. <br /> A full automatic fire alarms system is also required under the State Fire Code. <br /> 36. Red curbing and "No Parking" signage shall be installed by the <br /> applicant as a part of this permit at certain locations upon confirmation of Fire <br /> Department connections and fire hydrants. <br /> 37. Applicant shall comply with all City, State and Federal regulations, <br /> applicable to the Project, related to: fire and life safety, ADA requirements, and <br /> all general building code regulations as per the State Building Code as adopted <br /> and amended by the City of Redwood City. <br /> 38. Pursuant to Section 66474.9(b) of the California Government Code <br /> and/or Redwood City Municipal Code Section 1.54, Applicant shall defend, <br /> indemnify, and hold harmless the City, its agents, officers, and employees from <br /> any claim, action, or proceeding against the City or its agents, officers or <br /> employees, to attack, set aside, void, or annul an approval of the City, including <br /> but not limited to the City, and the City's agents, officers or employees, <br /> concerning the tentative parcel map and/or development permit. The City shall <br /> ATTY/RES0.2884/ APPROVAL OF VTM and PCP FOR 950 MIDDLEFIELD ROAD <br /> REV: 07-15-13 VR <br /> Page 8 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.