My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res13 15289
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2010-2019
>
2013
>
Res13 15289
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2019 1:08:58 PM
Creation date
7/24/2013 2:47:24 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
7/22/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
_ _ �.��. �... _... _ :�. � <br /> • Sewer Capital Facilities <br /> • Inflow and Infiltration <br /> • Wastewater Capacity <br /> • Water Meter Installation <br /> • Water System Capital Facilities <br /> • Water Tap <br /> • Site Plan and Architectural plan review as per the State Building and Fire Code for High- <br /> Rise structures. This also includes the necessary smoke evacuation or control systems <br /> design criteria. <br /> • Fire sprinkler,fire pump, back-up water supply, standpipes, and fire alarm plan review. <br /> • Fire Department site inspections for the fire sprinkler system, standpipes,fire pump, <br /> water supply,fire alarm, and smoke evacuation or control systems. <br /> • Final inspection for exiting,evacuation plans, and radio testing. <br /> • Building plan check <br /> • Building permit, including any specific system permits,such as plumbing, mechanical, <br /> electrical. <br /> ? D. Public Improvements <br /> As part of the development of the Project, the Developer shall be responsible for <br /> , constructing the following public improvements for all frontage abutting or adjoining the Site: <br /> • New sidewalk, curb, gutter <br /> ` • Catch basins and drainage inlets due to reconfigured roadway, sidewalk/curb/gutter work <br /> • Landscaping, street trees <br /> ', • Street lights <br /> • Pedestrian lights <br /> • Water service(domestic, irrigation, fire, &recycled water) <br /> : • Sewer service <br /> • Traffic signal improvements necessitated by the project (if and as required as part of a <br /> Project Approval) <br /> Developer may, at its option and subject to the requirements of the Parking Covenant, <br /> provide for valet parking as part of the operation of the parking garage for the Project. <br /> ' E. Parking Obli�ons <br /> The parking obligations to be maintained on the Site are set forth in the Parking Covenant <br /> and Agreement,the form of which is attached to the DDA as Exhibit I. <br /> -2- <br /> Exhibit H <br /> Scope of Development <br /> 2013.118JBLOCK 2 HUNTER STORM <br /> REV:07-26-13 PT <br />
The URL can be used to link to this page
Your browser does not support the video tag.