My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt13 Bay Area Coating Consultants, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2013
>
Agmt13 Under 60K
>
Agmt13 Bay Area Coating Consultants, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2013 12:21:53 PM
Creation date
7/25/2013 12:21:53 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Bay Area Coating Consultants, Inc.
PROJECT NAME
Coating inspection services watermain seismic improvement project at Bridge Pkwy and Shorebird Is. bridge
RMP File Number
304.5
Date
7/25/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
, <br /> EXHIBIT A <br /> 1. Scone of Work/Tasks <br /> Task l: <br /> Under this task, Bay Area Coating Consultants, Inc. (BACC) shall provide coating inspection <br /> services for the Watermain Seismic Improvement Project being performed at Bridge Parkway <br /> Bridge and at Shorebird Island Bridge in the Redwood Shores Area of Redwood City. BACC will <br /> provide a National Association of Corrosion Engineers (NACE) certified coating inspector to <br /> monitor the Contractors daily operations including surface preparation, lining application and to <br /> perform all required testing as per NACE,American Water Work Association(AWWA), and the <br /> Society for Protective Coatings(SSPC)guidelines and standards. <br /> Task 2: <br /> Under this task BACC shall provide the same type of services listed above for the Water Tanks <br /> and Pump Stations Seismic Improvement Project; Located at various Water Stations city wide, <br /> including Cambridge Tanks 1 and 2;and Wilmington Tank. <br /> 2. Deadline <br /> June 17,2014. <br /> 3. Deliverables <br /> BACC will provide daily written reports with photographs. <br /> 4. Pavment Terms. (Indicate if hourly, or flat fee) <br /> Payment will be on an hourly basis rate of Eighty Five and 00/100 Dollars ($85.00); and a <br /> minimum of 4 hours per visit. The amount of the agreement is not to exceed Nineteen Thousand <br /> Five Hundred Fifty and 00/100 Dollars($19,550.00),based on an estimate of Two Hundred Thirty <br /> (230)hours of service for both tasks. <br /> � 1 . � 1 ' 1 <br /> Reg.Hrs. O/T Hrs. Days Hotel Subsistence Truck Total <br /> Task 1 Watermain Seismic Improvement Project(BACC # 2012-51) <br /> 115 Hrs. 0.0 15 $0 $0 $0 $9,775.00 <br /> Task 2 Water Tank and Pump Station Seismic Improvement Project <br /> 115 Hrs. 0.0 15 $0 $0 $0 $9,775.00 <br /> , <br /> . • � � � <br /> ATTY/AGR/2013.115/BAYAREA COATING CONSULTANTS,INC. <br /> REV:07-12-13 VR <br /> Page 5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.